Revision history of "Construction of the bicycle path system in Elbląg: Fromborska – Inn – Krasny Forest" (Q132682)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 94,073 bytes +8 Changed label, description and/or aliases in pt
  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 94,065 bytes −10 Set a claim value: summary (P836): O projeto, que é uma continuação direta da linha de bicicletas pedonais existente na rua Fromborska, destinada a aumentar a atratividade turística dos recursos do património natural localizados na sua vizinhança imediata, incluirá: —construção de 2272 m de ciclo bidirecional e ciclo pedestre -renovação e regulação de escorregas - construção de iluminação pública - secção de árvores em colisão com a construção - organização do tráfego (marcações vert...

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 18:4518:45, 2 March 2023DG Regio talk contribs 90,540 bytes +550 Changed label, description and/or aliases in da, sk, lv, it, et, fr, ga, ro, el, sv, bg, hu, de, es, cs, sl, mt, lt, hr, nl, pt, fi, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 23:0523:05, 2 July 2022DG Regio talk contribs 88,315 bytes +56,977 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:5819:58, 2 December 2021DG Regio talk contribs 18,600 bytes +3,179 Created claim: summary (P836): Le projet, qui fait suite directement à l’itinéraire pédestre et cyclable existant dans la rue Fromborska, vise à accroître l’attrait touristique des ressources du patrimoine naturel dans ses environs immédiats: —construction de 2 272 m de parcours cyclable bidirectionnel pour piétons -rénovation et réglage des sorties -construction de l’éclairage des rues — coupe d’arbres en conflit avec la construction — organisation de la circulation (marquag...
  • curprev 19:5819:58, 2 December 2021DG Regio talk contribs 15,421 bytes +156 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1118:11, 21 October 2020DG Regio talk contribs 15,704 bytes +147 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1118:11, 21 October 2020DG Regio talk contribs 15,557 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1118:11, 21 October 2020DG Regio talk contribs 15,700 bytes +2,918 Created claim: summary (P836): The project, which is a direct continuation of the existing foot-bike line in Fromborska Street, aimed at increasing the tourist attractiveness of natural heritage resources located in its immediate vicinity, will include: —construction of 2272 m of bidirectional cycle and pedestrian cycle -renovation and regulation of slides – construction of street lighting – section of trees colliding with construction – organisation of traffic (vertical and...
  • curprev 18:1118:11, 21 October 2020DG Regio talk contribs 12,782 bytes −2,392 Removed claim: summary (P836): A project which is a direct continuation of the existing rush cycle in Fromborska, aimed at increasing the attractiveness of the natural heritage resources in its immediate vicinity, implies: — construction of 2 272 m for a two-way cycle/pedestrian — renovation and regulation of street lighting — the construction of street lighting -cutting of the trees in connection with the construction — the organisation of traffic (signs and markings, BRDs...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0613:06, 10 March 2020DG Regio talk contribs 13,455 bytes +2,392 Created claim: summary (P836): A project which is a direct continuation of the existing rush cycle in Fromborska, aimed at increasing the attractiveness of the natural heritage resources in its immediate vicinity, implies: — construction of 2 272 m for a two-way cycle/pedestrian — renovation and regulation of street lighting — the construction of street lighting -cutting of the trees in connection with the construction — the organisation of traffic (signs and markings, BRDs)...

25 February 2020

18 February 2020

31 January 2020

14 January 2020