Revision history of "Modernisation of the infrastructure of the Training and Leisure Centre ZHP “Perkoz” for non-school forms of nautical training and water education" (Q132641)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 92,373 bytes +2 Changed label, description and/or aliases in pt
  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 92,371 bytes −15 Set a claim value: summary (P836): Este projeto, executado entre 05.011.2018 e 31.12.2019r, consistirá na modernização de infraestruturas pertencentes à Associação Polaca de Escuteiros e localizadas no centro «Perkoz» no lago Pluszne (distrito do lago Olsztyn). As atividades incluirão a reconstrução do hangar, a reparação da ponte e a aquisição do equipamento necessário para conduzir uma escola de vela e uma educação sobre a água amplamente compreendida (inundações, equipamento para...

23 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2320:23, 2 March 2023DG Regio talk contribs 89,628 bytes −913 Changed label, description and/or aliases in it, lv, da, sk, ga, hr, es, sl, et, fi, ro, el, cs, sv, fr, lt, bg, de, pt, nl, hu, mt, and other parts

25 October 2022

22 October 2022

27 July 2022

  • curprev 17:4817:48, 27 July 2022DG Regio talk contribs 88,867 bytes +57,506 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 18,655 bytes +3,150 Created claim: summary (P836): Ce projet, mis en œuvre du 05.011.2018 au 31.12.2019, consistera en la modernisation des infrastructures appartenant à l’Association polonaise des scouts et situées dans le centre Perkoz sur le lac Pluszne (district du lac Olsztyn). Les activités comprendront la reconstruction du hangar, la réparation de la jetée et l’achat d’équipements nécessaires à l’exploitation de la pépinière à voile et à l’éducation à l’eau au sens large (bateaux, équipem...
  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 15,505 bytes +232 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1018:10, 21 October 2020DG Regio talk contribs 15,712 bytes +209 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1018:10, 21 October 2020DG Regio talk contribs 15,503 bytes −193 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1018:10, 21 October 2020DG Regio talk contribs 15,696 bytes +2,821 Created claim: summary (P836): This project implemented from 05.011.2018 to 31.12.2019r will consist of modernisation of infrastructure belonging to the Polish Scouting Association and located in the “Perkoz” Centre on Lake Pluszne (Olsztyn Lake District). The activities will include the reconstruction of the hangar, the repair of the bridge and the purchase of equipment necessary to conduct a sailing school and a broadly understood water education (flood, equipment for saili...
  • curprev 18:1018:10, 21 October 2020DG Regio talk contribs 12,875 bytes −2,459 Removed claim: summary (P836): This project, which runs from 05.011.2018 to 31.12.2019, will consist of an upgrade of the infrastructure belonging to the Polish Union of the Polish Union and located in the Centre “Perkoz” above Lake Pluszne Lake. The activities will cover the reconstruction of the hangar, the renovation of the bridge and the purchase of the necessary equipment for the sailing of the mariner and the wider water upbringing (boats, boat training equipment and...

25 September 2020

24 September 2020

15 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0613:06, 10 March 2020DG Regio talk contribs 13,612 bytes +2,459 Created claim: summary (P836): This project, which runs from 05.011.2018 to 31.12.2019, will consist of an upgrade of the infrastructure belonging to the Polish Union of the Polish Union and located in the Centre “Perkoz” above Lake Pluszne Lake. The activities will cover the reconstruction of the hangar, the renovation of the bridge and the purchase of the necessary equipment for the sailing of the mariner and the wider water upbringing (boats, boat training equipment and re...

25 February 2020

18 February 2020

31 January 2020

14 January 2020