Revision history of "Revaloration of the area at the St. Jakuba w Olsztyn pod urban planty" (Q132557)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2818:28, 9 October 2024DG Regio talk contribs 88,031 bytes +1 Changed label, description and/or aliases in pt
  • curprev 18:2818:28, 9 October 2024DG Regio talk contribs 88,030 bytes +18 Set a claim value: summary (P836): O objeto do projeto é a criação da chamada fábrica urbana em Olsztyn. A área para o estabelecimento da planta está localizada na parte central da cidade. Estas são as áreas diretamente adjacentes às paredes que cercam a Catedral Sagrada. Jacó e a nova Casa dos Peregrinos. Atualmente, a área coberta pelo projeto entre a S. Money Street e as fortificações da cidade com a Catedral Basílica de São Jacó é em grande parte negligenciada e usada apenas de f...

22 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2220:22, 2 March 2023DG Regio talk contribs 85,254 bytes −732 Changed label, description and/or aliases in da, lv, it, sk, sv, fr, et, pt, cs, ga, mt, ro, fi, hr, lt, nl, sl, el, hu, es, de, bg, and other parts

22 October 2022

2 July 2022

  • curprev 23:0223:02, 2 July 2022DG Regio talk contribs 85,167 bytes +54,512 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 19:4319:43, 2 December 2021DG Regio talk contribs 18,245 bytes +3,042 Created claim: summary (P836): L’objet du projet est l’établissement de la soi-disant usine urbaine à Olsztyn. Le site prévu pour l’établissement de l’usine est situé dans la partie centrale de la ville. Il s’agit de zones adjacentes directement aux murs entourant la cathédrale Sainte-Marie. Jakub et le nouveau Pèlerin’s House. Actuellement, la zone couverte par le projet entre la rue S. Pieniężny et les digues urbaines avec la basilique archathédrale Saint-Pierre. Jacob est...
  • curprev 19:4319:43, 2 December 2021DG Regio talk contribs 15,203 bytes +151 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:4317:43, 21 October 2020DG Regio talk contribs 15,491 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4317:43, 21 October 2020DG Regio talk contribs 15,363 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4317:43, 21 October 2020DG Regio talk contribs 15,512 bytes +2,782 Created claim: summary (P836): The subject of the project is the creation of the so-called urban plant in Olsztyn. The area for the establishment of the plant is located in the central part of the city. These are the areas directly adjacent to the walls surrounding the Holy Cathedral. Jacob and the new Pilgrim House. Currently, the area covered by the project between S. Money Street and the city fortifications with the Cathedral Basilica of St. Jacob is largely neglected and...
  • curprev 17:4317:43, 21 October 2020DG Regio talk contribs 12,730 bytes −2,309 Removed claim: summary (P836): The project involves the creation of an urban planning in Olsztyn. The site envisaged for the plant is located in the central part of the city. These areas are directly adjacent to the surrounding walls of the Cathedral of Świecie. Jakub and the new House of Pielfungus. Currently, the area covered by the project between the streets of S. (Cash) and the urban environment with the Basilica of the St John’s Archipelago. James is largely neglected...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0413:04, 10 March 2020DG Regio talk contribs 13,323 bytes +2,309 Created claim: summary (P836): The project involves the creation of an urban planning in Olsztyn. The site envisaged for the plant is located in the central part of the city. These areas are directly adjacent to the surrounding walls of the Cathedral of Świecie. Jakub and the new House of Pielfungus. Currently, the area covered by the project between the streets of S. (Cash) and the urban environment with the Basilica of the St John’s Archipelago. James is largely neglected a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020