Revision history of "Continuation of master plan for Great Masurian Lakes – protection of surface waters of the area through the extension and modernisation of water and sewage infrastructure – agglomeration Orzysz" (Q132501)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 93,803 bytes +19 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 93,784 bytes −55 Set a claim value: summary (P836): O projeto incluirá a construção de uma rede de água/canal com rede de transmissão em Mikosze, na cidade de Orzysz, e san can com estações de bombagem em Grądy. Todas as águas residuais serão enviadas para a estação de tratamento de águas residuais de Orzysz. O projeto consiste em três tarefas de investimento:Zad 1-Construção de um canal de água e sanitário para a praia da cidade na rua Leśna, em Orzysz, com uma central de bombagem de energia e insta...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

9 June 2023

24 May 2023

2 March 2023

3 November 2022

25 October 2022

22 October 2022

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 19:4119:41, 2 December 2021DG Regio talk contribs 18,448 bytes +3,012 Created claim: summary (P836): Le projet comprend la construction d’un réseau eau/canal avec réseau de transport à Mikosze à Orzysz et can. san. avec stations de pompage à Grądy. Toutes les eaux usées iront à l’usine de traitement des eaux usées d’Orzysz. Le projet se compose de 3 tâches d’investissement: Zad 1- Construction d’un canal d’eau et sanitaire à la plage municipale de la rue Leśna à Orzysz avec une station de pompage réseau et une installation interne ENN Zad 2 — C...
  • curprev 19:4119:41, 2 December 2021DG Regio talk contribs 15,436 bytes +293 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:4117:41, 21 October 2020DG Regio talk contribs 15,582 bytes +257 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4117:41, 21 October 2020DG Regio talk contribs 15,325 bytes −261 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4117:41, 21 October 2020DG Regio talk contribs 15,586 bytes +2,584 Created claim: summary (P836): The project will include. construction of water/channel network with transmission network in Mikosze in the town of Orzysz and san can with pumping stations in Grądy. All the sewage will be sent to the sewage treatment plant in Orzysz. The project consists of 3 investment tasks:Zad 1-Construction of water and sanitary canal to the city beach at Leśna Street in Orzysz with a power pumping plant and internal installation ENN Zad 2 – Construction o...
  • curprev 17:4117:41, 21 October 2020DG Regio talk contribs 13,002 bytes −2,138 Removed claim: summary (P836): Construction of a network of wad/kan networks with transmission networks in the town of Mikołów, m. Orzyz and can. an. with pumping stations in the districts. The whole of the waste water will be transferred to the wastewater treatment plant in Okrzyn. The project consists of 3 investment projects: zad 1 — constructed networks of wd and a sanitary sewage system to a beach at ul. Leśna Street, with a network pumping station and an internal inst...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0313:03, 10 March 2020DG Regio talk contribs 13,417 bytes +2,138 Created claim: summary (P836): Construction of a network of wad/kan networks with transmission networks in the town of Mikołów, m. Orzyz and can. an. with pumping stations in the districts. The whole of the waste water will be transferred to the wastewater treatment plant in Okrzyn. The project consists of 3 investment projects: zad 1 — constructed networks of wd and a sanitary sewage system to a beach at ul. Leśna Street, with a network pumping station and an internal instal...

25 February 2020

18 February 2020

31 January 2020

14 January 2020