Revision history of "Replacement and reconstruction of the water treatment system with the expansion of the technological system with retency and levelling tanks with a second degree pumping system in the existing SUW in Rybno" (Q132488)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 96,440 bytes +4 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 96,436 bytes −112 Set a claim value: summary (P836): Serão tomadas as seguintes medidas: substituição do equipamento SUW em Rybno por água potável de boa qualidade, simplificando o sistema de fluxo de água de modo a garantir a manutenção da pressão adequada e, ao mesmo tempo, economizando energia. Estão previstas as seguintes obras: substituição e renovação do sistema técnico de tratamento de águas com base na filtração-desfertilização e desmanganização em filtros de pressão em duas fases e expansão d...

22 March 2024

15 January 2024

13 December 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2220:22, 2 March 2023DG Regio talk contribs 93,013 bytes +1,780 Changed label, description and/or aliases in lv, da, it, sk, fi, fr, et, ga, sv, ro, pt, es, de, bg, hu, el, cs, sl, hr, lt, nl, mt, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 23:0023:00, 2 July 2022DG Regio talk contribs 89,554 bytes +57,518 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 19:4119:41, 2 December 2021DG Regio talk contribs 18,842 bytes +3,212 Created claim: summary (P836): Des mesures seront prises: remplacement de l’équipement SUW à Rybno par une qualité d’eau potable adéquate, flux d’eau vers le réseau pour assurer le maintien d’une pression adéquate tout en économisant de l’énergie. Les travaux suivants sont prévus: remplacement et reconstruction de la technologie inst.. traitement de l’eau basé sur la filtration-de-fer en deux étapes et la démanganisation dans les filtres à pression et l’expansion du système t...
  • curprev 19:4119:41, 2 December 2021DG Regio talk contribs 15,630 bytes +312 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:4117:41, 21 October 2020DG Regio talk contribs 15,757 bytes +265 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4117:41, 21 October 2020DG Regio talk contribs 15,492 bytes −281 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4117:41, 21 October 2020DG Regio talk contribs 15,773 bytes +2,760 Created claim: summary (P836): Action will be taken: replacement of SUW equipment in Rybno for good quality drinking water, streamlining the water flow system so as to ensure that proper pressure is maintained while at the same time saving energy. The following works are planned: replacement and refurbishment of inst. technologist water treatment based on two-stage filtration-defertilisation and demanganisation in pressure filters and expansion of the technological system wit...
  • curprev 17:4117:41, 21 October 2020DG Regio talk contribs 13,013 bytes −2,320 Removed claim: summary (P836): Action will be taken: the replacement of SUW devices in Riga to ensure the proper quality of drinking water, improving the draining of water into the grid so as to ensure that the correct press is maintained while saving energy. It is planned to carry out the following work: water treatment and conversion. water treatment based on the filtration of two stages of water treatment and filtration in pressure filters and extension of the technology...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0213:02, 10 March 2020DG Regio talk contribs 13,605 bytes +2,320 Created claim: summary (P836): Action will be taken: the replacement of SUW devices in Riga to ensure the proper quality of drinking water, improving the draining of water into the grid so as to ensure that the correct press is maintained while saving energy. It is planned to carry out the following work: water treatment and conversion. water treatment based on the filtration of two stages of water treatment and filtration in pressure filters and extension of the technology s...

25 February 2020

18 February 2020

31 January 2020

14 January 2020