Revision history of "Thermal modernisation of the building at ul. Weather 2 in Pozezdra" (Q132368)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

6 July 2023

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 18:4518:45, 2 March 2023DG Regio talk contribs 91,555 bytes +998 Changed label, description and/or aliases in lv, it, da, sk, fi, et, ga, es, ro, de, hu, sv, bg, cs, pt, mt, sl, lt, nl, hr, fr, el, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 22:5822:58, 2 July 2022DG Regio talk contribs 88,883 bytes +57,208 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:3319:33, 2 December 2021DG Regio talk contribs 18,679 bytes +3,318 Created claim: summary (P836): Le projet comprendra la préparation d’une étude de faisabilité, des travaux de construction, la supervision des investisseurs et la promotion du projet. Le projet consistera en une modernisation énergétique complète du bâtiment SP (y compris la partie résidentielle) à Pozezdrz. Les travaux thermiques comprendront: • Isolation des murs extérieurs • Réchauffement du plafond au-dessus de la dernière laine minérale • Remplacement de la menuiserie de...
  • curprev 19:3319:33, 2 December 2021DG Regio talk contribs 15,361 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:1317:13, 21 October 2020DG Regio talk contribs 15,680 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1317:13, 21 October 2020DG Regio talk contribs 15,555 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1317:13, 21 October 2020DG Regio talk contribs 15,680 bytes +2,955 Created claim: summary (P836): The project will include preparation of feasibility studies, construction works, investor supervision and project promotion. The project will consist of a comprehensive energy modernisation of the SP building (including residential part) in Pozezdrzu. Thermal works will include: • Warming of the outer walls • Warming of the ceiling over the last cond. mineral wool • Replacement of the window joinery with a new • Replacement of old doors with new...
  • curprev 17:1317:13, 21 October 2020DG Regio talk contribs 12,725 bytes −2,427 Removed claim: summary (P836): The project will include the preparation of a feasibility study, construction work, investor supervision and the promotion of the project. The project will consist of a comprehensive energy modernisation of the building SP (including the residential part) in Pozdruz. The work to be carried out will include: • insulation of the outer walls• the insulation of the ceiling for the last one, the mineral wool• The change in window frames for the new...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0313:03, 10 March 2020DG Regio talk contribs 13,440 bytes +2,427 Created claim: summary (P836): The project will include the preparation of a feasibility study, construction work, investor supervision and the promotion of the project. The project will consist of a comprehensive energy modernisation of the building SP (including the residential part) in Pozdruz. The work to be carried out will include: • insulation of the outer walls• the insulation of the ceiling for the last one, the mineral wool• The change in window frames for the new•...

25 February 2020

18 February 2020

31 January 2020

14 January 2020