Revision history of "“Termomodernisation of the building and replacement of central heating installations, ul. Sappers 6, 82-300 Elbląg”" (Q132350)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 83,333 bytes +17 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 83,316 bytes −452 Set a claim value: summary (P836): O objeto do projeto é uma modernização térmica profunda e abrangente do edifício em ul. Esquadrão de Bombardeiros 6 em Elbląg. Área utilizável da instalação – 820,91 m2 De acordo com a auditoria energética realizada à instalação e ao projeto de construção para alcançar parâmetros energéticos ótimos para o objeto, é necessário realizar a seguinte gama de materiais de obras de modernização térmica: • Modernização das paredes interiores da adega com gr...

23 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2220:22, 2 March 2023DG Regio talk contribs 80,233 bytes +7,217 Changed label, description and/or aliases in da, it, hr, sk, fi, ro, et, sv, lv, pt, el, cs, es, ga, nl, hu, fr, sl, lt, de, bg, mt, and other parts

25 October 2022

22 October 2022

27 July 2022

  • curprev 17:4417:44, 27 July 2022DG Regio talk contribs 71,343 bytes +41,953 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:3219:32, 2 December 2021DG Regio talk contribs 17,462 bytes +2,885 Created claim: summary (P836): Le sujet du projet est une thermomodernisation profonde et complète du bâtiment à ul. L’équipe de bombes 6 à Elbląg. Surface utilisable du bâtiment — 820,91 m² Selon l’audit énergétique de l’installation et du projet de construction, il est nécessaire de réaliser les travaux suivants de modernisation thermique des matériaux afin d’obtenir des paramètres énergétiques optimaux pour l’installation: • Cloisons — isolation des murs extérieurs du sous...
  • curprev 19:3219:32, 2 December 2021DG Regio talk contribs 14,577 bytes +192 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:1317:13, 21 October 2020DG Regio talk contribs 14,824 bytes +180 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1317:13, 21 October 2020DG Regio talk contribs 14,644 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1317:13, 21 October 2020DG Regio talk contribs 14,804 bytes +2,093 Created claim: summary (P836): The subject of the project is a deep, comprehensive thermal modernisation of the building at ul. Bomb squad 6 in Elbląg. Usable area of the facility – 820,91 m² According to the conducted energy audit of the facility and construction project to achieve optimal energy parameters for the object, it is necessary to carry out the following material range of thermal modernisation works: • Modernisation of the interior walls of the cellar with gr. 10...
  • curprev 17:1317:13, 21 October 2020DG Regio talk contribs 12,711 bytes −1,902 Removed claim: summary (P836): The object of the project is the deep and comprehensive thermal renovation of the building at ul. Saperów 6 in Elbląg. Useful surface area of the plant — 820.91 m² According to the energy audit of the plant and the construction project in order to achieve the optimal energy parameters for the plant, the following material scope of renovation work is necessary: • Brody — heating from the external walls of the basement of the basement of the squ...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0313:03, 10 March 2020DG Regio talk contribs 12,892 bytes +1,902 Created claim: summary (P836): The object of the project is the deep and comprehensive thermal renovation of the building at ul. Saperów 6 in Elbląg. Useful surface area of the plant — 820.91 m² According to the energy audit of the plant and the construction project in order to achieve the optimal energy parameters for the plant, the following material scope of renovation work is necessary: • Brody — heating from the external walls of the basement of the basement of the squar...

25 February 2020

18 February 2020

31 January 2020

14 January 2020