Revision history of "Improving the energy efficiency of educational buildings in the Municipality of Kętrzyn" (Q132328)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2606:26, 9 October 2024DG Regio talk contribs 92,272 bytes +196 Set a claim value: summary (P836): O projeto consiste na termomodernização de 3 instalações de utilidade pública em parcelas: N.o 15, circunferência 3, n.o 142/2 circunferência 1, parcela n.o 97 da área 3. No âmbito das obras de construção: Tarefa 1. Edifício escolar – obras de modernização térmica (aquecimento do chão no chão, aquecimento do tecto sob o sótão, aquecimento das paredes exteriores a partir do interior, substituição das janelas, substituição das portas exteriores, renov...

20 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

25 October 2022

22 October 2022

27 July 2022

  • curprev 17:4417:44, 27 July 2022DG Regio talk contribs 89,885 bytes +58,428 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:2112:21, 2 December 2021DG Regio talk contribs 18,554 bytes +3,155 Created claim: summary (P836): Le projet consiste à thermomoderniser 3 services publics sur des parcelles: No 15, division 3, no 142/2, division 1, placette no 97, division 3. Dans le cadre des travaux de construction: Activité 1. Bâtiment scolaire — travaux de thermomodernisation (réchauffement du sol, réchauffement du plafond sous le grenier réchauffement des murs extérieurs de l’intérieur, remplacement des fenêtres, remplacement des portes extérieures, rénovation des porte...
  • curprev 12:2112:21, 2 December 2021DG Regio talk contribs 15,399 bytes +164 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,674 bytes +147 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,527 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,669 bytes +3,007 Created claim: summary (P836): The project consists of the thermomodernisation of 3 public utility facilities on plots: No. 15, circumference 3, No 142/2 circumference 1, plot No 97 of area 3. Within the framework of construction works: Task 1. School building – thermal modernisation works (warming of the floor on the ground, warming of the ceiling under the attic warming the outer walls from the inside, replacement of windows, replacement of external doors, renovation of ext...
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 12,662 bytes −2,380 Removed claim: summary (P836): The project involves the thermal modernisation of 3 public utilities on the parcels: no 15, of 3, No 142/2, 1th rim, plot no 97, 3. For construction work: Target 1. School building — thermal modernisation works (insulation of the floor on the ground, insulation of the floor under the insulation of external walls from the inside, replacement of windows, replacement of external doors, renovation of the external doors). Target 2. School building...

17 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0313:03, 10 March 2020DG Regio talk contribs 13,316 bytes +2,380 Created claim: summary (P836): The project involves the thermal modernisation of 3 public utilities on the parcels: no 15, of 3, No 142/2, 1th rim, plot no 97, 3. For construction work: Target 1. School building — thermal modernisation works (insulation of the floor on the ground, insulation of the floor under the insulation of external walls from the inside, replacement of windows, replacement of external doors, renovation of the external doors). Target 2. School building —...

25 February 2020

18 February 2020

31 January 2020

14 January 2020