Revision history of "THERMAL MODERNISATION OF PUBLIC UTILITY BUILDINGS" (Q132322)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 90,403 bytes +17 Changed label, description and/or aliases in pt
  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 90,386 bytes +71 Set a claim value: summary (P836): O projeto será realizado no município rural de Płonica. O âmbito material do projeto inclui a termomodernização de edifícios utilizando públicos: — Bombeiros OSP em Niechłonin: intensificar as paredes exteriores da parte antiga, o aquecimento da parte antiga, o aquecimento do novo telhado, spran. syst. syst. ssst. ssst. new inst. c.o.; — Incêndio OSP no altifalante: dociepl. paredes exteriores, dociepl. stropodachów, adicionar ao teto da adega e as...

20 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

25 October 2022

22 October 2022

2 July 2022

  • curprev 22:5722:57, 2 July 2022DG Regio talk contribs 88,368 bytes +56,613 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:2112:21, 2 December 2021DG Regio talk contribs 18,644 bytes +3,349 Created claim: summary (P836): Le projet sera mis en œuvre sur le territoire de la commune rurale — la municipalité de Płośnica. Le champ d’application matériel du projet comprend la thermomodernisation des bâtiments publ: — Casernes de pompiers du GRT dans les non-absorbants: le réchauffement des murs extérieurs de l’ancienne partie, le réchauffement de l’ancienne partie, le réchauffement du nouveau toit, le système de curiosité, l’exécution de la nouvelle inst. — Caserne du...
  • curprev 12:2112:21, 2 December 2021DG Regio talk contribs 15,295 bytes +101 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,637 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,527 bytes −111 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,638 bytes +2,944 Created claim: summary (P836): The project will be in the rural commune – Płonica Municipality. The material scope of the project includes thermomodernisation of buildings using publ: — OSP firehouses in Niechłonin: intensify the outer walls of the old part, warming of the old part, warming of the new roof, spran. syst. syst. ssst. ssst. new inst. c.o.; — OSP fire in Speaker: dociepl. outside walls, dociepl. stropodachów, add to the ceiling of the cellar and the walls between...
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 12,694 bytes −2,626 Removed claim: summary (P836): The project will be implemented. it will be located in the village of Gmina Plantnica. The material scope consists of the thermo-modernisation of buildings used in publ: — TSOs’ remitters: the walls of the inner part of the old part, inquiring into the upper part of the older part, the insulation of the new roof, the insulation of the new roof, the refurbishment of a new roof, a new c.o; — TSOs in the schedule: a wall enquiring about the costu...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0313:03, 10 March 2020DG Regio talk contribs 13,598 bytes +2,626 Created claim: summary (P836): The project will be implemented. it will be located in the village of Gmina Plantnica. The material scope consists of the thermo-modernisation of buildings used in publ: — TSOs’ remitters: the walls of the inner part of the old part, inquiring into the upper part of the older part, the insulation of the new roof, the insulation of the new roof, the refurbishment of a new roof, a new c.o; — TSOs in the schedule: a wall enquiring about the costume...

25 February 2020

18 February 2020

31 January 2020

14 January 2020