Revision history of "Thermal modernisation of public buildings – Primary School No. 2 and No. 4 in Iława." (Q132318)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 93,888 bytes +3 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 93,885 bytes −333 Set a claim value: summary (P836): O projeto diz respeito a uma modernização energética abrangente de duas instalações de utilidade pública em Iława: Escola Primária (SP) n.o 2 e SP n.o 4. Inclui a modernização térmica dos edifícios e a modernização da iluminação. Âmbito de aplicação: trabalhos preparatórios (doc. design com auditoria energet.), trabalhos de construção resultantes de auditorias energéticas e iluminação (substituição/modernização parcial da instalação, substituição do...

7 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:5722:57, 2 July 2022DG Regio talk contribs 83,060 bytes +52,136 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:2012:20, 2 December 2021DG Regio talk contribs 18,246 bytes +3,245 Created claim: summary (P836): Le projet concerne une modernisation complète de l’énergie de 2 installations d’utilité publique à Iława: École primaire (SP) no 2 et SP no 4. Comprend la thermomodernisation des bâtiments et la modernisation de l’éclairage. Champ d’application: travaux préparatoires (document de projet avec audit énergétique), travaux de construction résultant de l’énerget. et audits d’éclairage (remplacement partiel/modernisation des installations co, remplace...
  • curprev 12:2012:20, 2 December 2021DG Regio talk contribs 15,001 bytes +145 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,295 bytes +146 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,149 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 15,293 bytes +2,525 Created claim: summary (P836): The project concerns a comprehensive energy modernisation of 2 utility facilities publ. in Iława: Primary School (SP) No 2 and SP No 4. It includes thermal modernisation of buildings and modernisation of lighting. Scope: preparatory works (doc. design with audit energet.), construction works resulting from energy audits. and lighting (partial replacement/modernisation of the installation, replacement of roof covering in gymnast., warming of the...
  • curprev 17:1217:12, 21 October 2020DG Regio talk contribs 12,768 bytes −1,717 Removed claim: summary (P836): The project concerns a comprehensive energy modernisation of 2 public utilities in Iława: Primary schools No 2 and SP 4. It covers the thermal renovation of buildings and the modernisation of lighting. Scope: preparatory work (design document with audit of energy.), construction works resulting from energy audits. supervision in the project (author’s supervision, investor); project promotion. The project leads to lower primary and final energy...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0313:03, 10 March 2020DG Regio talk contribs 12,762 bytes +1,717 Created claim: summary (P836): The project concerns a comprehensive energy modernisation of 2 public utilities in Iława: Primary schools No 2 and SP 4. It covers the thermal renovation of buildings and the modernisation of lighting. Scope: preparatory work (design document with audit of energy.), construction works resulting from energy audits. supervision in the project (author’s supervision, investor); project promotion. The project leads to lower primary and final energy c...

25 February 2020

18 February 2020

31 January 2020

14 January 2020