Revision history of "Thermal modernisation of the building of the Holy Commune Office" (Q132278)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 22:1022:10, 2 March 2023DG Regio talk contribs 74,100 bytes +430 Changed label, description and/or aliases in it, sk, da, ga, et, bg, lv, mt, cs, lt, pt, fi, fr, de, ro, el, sv, sl, nl, hr, hu, es, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:5622:56, 2 July 2022DG Regio talk contribs 71,989 bytes +45,115 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:1812:18, 2 December 2021DG Regio talk contribs 16,616 bytes +2,505 Created claim: summary (P836): Ce projet consiste en la thermomodernisation du bâtiment d’utilité publique — le bureau municipal de Świętajno. Il s’agit de la modernisation énergétique approfondie et complète du bâtiment public. Le champ d’application matériel de l’investissement comprend: Isolation des murs extérieurs (y compris les fondations), réchauffement du toit. Dans le cadre des travaux préparatoires, la documentation du projet a été élaborée, comprenant: Audit énergé...
  • curprev 12:1812:18, 2 December 2021DG Regio talk contribs 14,111 bytes +126 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:0117:01, 21 October 2020DG Regio talk contribs 14,424 bytes +123 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0117:01, 21 October 2020DG Regio talk contribs 14,301 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0117:01, 21 October 2020DG Regio talk contribs 14,429 bytes +2,297 Created claim: summary (P836): This project consists of the thermomodernisation of the public utility building – the Municipal Office in Świętojno. It concerns a deep and comprehensive energy modernisation of the public building. The material scope of the investment shall include: Warming of external walls (including foundations), roof warming. As part of the preparatory work, a project documentation consisting of: Energy audit, feasibility study. The project’s target group s...
  • curprev 17:0117:01, 21 October 2020DG Regio talk contribs 12,132 bytes −1,807 Removed claim: summary (P836): This project consists of the thermal refurbishment of the public building — the Municipality Office in Świętokrzyski. It concerns deep and comprehensive energy modernisation of the public building. The material scope of the investment consists of: Insulation of external walls (including fundamental), roof insulation. As part of the preparatory work, a project dossier has been prepared consisting of: Energy audit, Feasibility Study. The target...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:2220:22, 10 March 2020DG Regio talk contribs 12,217 bytes +1,807 Created claim: summary (P836): This project consists of the thermal refurbishment of the public building — the Municipality Office in Świętokrzyski. It concerns deep and comprehensive energy modernisation of the public building. The material scope of the investment consists of: Insulation of external walls (including fundamental), roof insulation. As part of the preparatory work, a project dossier has been prepared consisting of: Energy audit, Feasibility Study. The target gr...

25 February 2020

18 February 2020

31 January 2020

14 January 2020