Revision history of "Improving the energy efficiency of Reston’s building" (Q132213)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5422:54, 2 July 2022DG Regio talk contribs 113,221 bytes +81,219 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:1312:13, 2 December 2021DG Regio talk contribs 19,673 bytes +3,128 Created claim: summary (P836): L’objectif principal du projet est d’atteindre les meilleurs paramètres environnementaux possibles. Le projet tient compte des travaux de modernisation suivants: —Réchauffement des murs extérieurs -Isolation de stockage -Chauffage du plafond sous un grenier non chauffé -Remplacement des fenêtres -Remplacement des portes et des portes extérieures, cloisons transparentes -Modernisation du système de chauffage central avec le remplacement d’une sou...
  • curprev 12:1312:13, 2 December 2021DG Regio talk contribs 16,545 bytes +125 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:5916:59, 21 October 2020DG Regio talk contribs 16,859 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5916:59, 21 October 2020DG Regio talk contribs 16,746 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5916:59, 21 October 2020DG Regio talk contribs 16,859 bytes +4,152 Created claim: summary (P836): The main objective of the project is to achieve the best environmental parameters possible. The project takes into account the following scope of modernisation work: —Increasing of external walls -Hotification of ceilings -Hotification of the ceiling under unheated attic – Window exchange – Replacement of doors and external gates, transparent partitions -Modernisation of central heating system with heat source exchange -Modernisation of power un...
  • curprev 16:5916:59, 21 October 2020DG Regio talk contribs 12,707 bytes −2,332 Removed claim: summary (P836): The main objective of the project is to achieve the best environmental parameters. The project takes into account the following scope of modernisation works: — insulation of external walls -insulation of the roof to heat down the ceiling — Replacement of windows -Exchange of windows -Exchange of doors and external gateways, transparent micro-heating and cooling of the central heating system together with the replacement of the heat source, the...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:2020:20, 10 March 2020DG Regio talk contribs 13,331 bytes +2,332 Created claim: summary (P836): The main objective of the project is to achieve the best environmental parameters. The project takes into account the following scope of modernisation works: — insulation of external walls -insulation of the roof to heat down the ceiling — Replacement of windows -Exchange of windows -Exchange of doors and external gateways, transparent micro-heating and cooling of the central heating system together with the replacement of the heat source, the r...

25 February 2020

18 February 2020

31 January 2020

14 January 2020