Revision history of "Improving energy efficiency in the company BONA PLUS SP. Z O.O. LIMITED PARTNERSHIP" (Q132198)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5422:54, 2 July 2022DG Regio talk contribs 81,378 bytes +50,795 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:2012:20, 2 December 2021DG Regio talk contribs 18,152 bytes +3,075 Created claim: summary (P836): Le projet a pour objet les travaux thermomodernes du bâtiment Kętrzyńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (avant la ventilation 123/87), 123/139 123/140 (avant la ventilation 123/86). Murs extérieurs (Styrop.-?=0,040W/m*K,1496,4 m²) — mur du sous-sol (Styrop-?=0,040W/m*K, 183,8 m²) — mur extérieur près du sol (Styrop.-?=0,040W/m*K, 523,6 m²) -stropodes (min. de laine,?=0,037W/m*K, 318,0 m², styropape avec pâte asflat, 0,040 W/m*K,1...
  • curprev 12:2012:20, 2 December 2021DG Regio talk contribs 15,077 bytes +155 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:5916:59, 21 October 2020DG Regio talk contribs 15,361 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5916:59, 21 October 2020DG Regio talk contribs 15,219 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5916:59, 21 October 2020DG Regio talk contribs 15,351 bytes +2,592 Created claim: summary (P836): The subject of the project is the work of thermomoods in the building-Kętrzyńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (before division 123/87), 123/139 123/140 (before the division of 123/86). scope: (523 sq.m) (syrop-?=0.040W/m*K,1496,4 m²) – the outer wall of the cellar (syrop-?=0.040W/m*K, 183.8 m²) – the outer wall at the ground (syrop, 1342,0,037 ft) above,040W/m*K, 523.6 m²)-stropods (wool min.,?=0,037W/m) —Modernisation of the v...
  • curprev 16:5916:59, 21 October 2020DG Regio talk contribs 12,759 bytes −2,441 Removed claim: summary (P836): The object of the project is the work of thermo-modem in the buildings of Kęczenńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (before the division 123/87), 123/139 123/140 (before division 123/86). — Strict external (styrop.-? = 0,040W/m * K, 1 496.4 m²) — basement in the basement (contact plate — p.-? = 0,040W/m * K, 183.8 m²) — round (wool,? = 0,037 W/m * K, 523.6 m²) — costumes (wool,? = 0,040 W/m * K, 318.0 m², styropap, wood wool,?...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:0820:08, 10 March 2020DG Regio talk contribs 13,475 bytes +2,441 Created claim: summary (P836): The object of the project is the work of thermo-modem in the buildings of Kęczenńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (before the division 123/87), 123/139 123/140 (before division 123/86). — Strict external (styrop.-? = 0,040W/m * K, 1 496.4 m²) — basement in the basement (contact plate — p.-? = 0,040W/m * K, 183.8 m²) — round (wool,? = 0,037 W/m * K, 523.6 m²) — costumes (wool,? = 0,040 W/m * K, 318.0 m², styropap, wood wool,? =...

25 February 2020

18 February 2020

31 January 2020

14 January 2020