Revision history of "Improving energy efficiency in Auto-Pac" (Q132159)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5322:53, 2 July 2022DG Regio talk contribs 75,867 bytes +45,009 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:1712:17, 2 December 2021DG Regio talk contribs 18,027 bytes +3,268 Created claim: summary (P836): Le projet concerne les travaux dans le bâtiment d’infrastructure existant à Świętajno ul.Spółdzielcza 5, no działki:469/33 Application de la couche d’isolation thermique des murs extérieurs,Isolation de toit par l’utilisation de la couche d’isolation thermique,Augmentation du sol au sol par l’utilisation de la couche d’isolation thermique,Remplacement de Windows,Remplacement partiel de la porte,Modernisation de l’installation de CO par l’utilisa...
  • curprev 12:1712:17, 2 December 2021DG Regio talk contribs 14,759 bytes +119 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:5516:55, 21 October 2020DG Regio talk contribs 15,079 bytes +98 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5516:55, 21 October 2020DG Regio talk contribs 14,981 bytes −98 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5516:55, 21 October 2020DG Regio talk contribs 15,079 bytes +2,361 Created claim: summary (P836): The project concerns work in the existing infrastructure-building in Świjno ul.Spółdzielcza 5, plot no.469/33 Application of thermal insulation layer of the outer walls.,Hotification of the roof by compressing layer of thermal insulation, Insulated floor on the ground through the use of thermal insulation. —submission of application – signing of the DOF agreement. —selection of the contractor according to competitiveness -conclusion of the contr...
  • curprev 16:5516:55, 21 October 2020DG Regio talk contribs 12,718 bytes −2,427 Removed claim: summary (P836): The project concerns the work on the existing infrastructure of the building in Świętoul.Spółdzielcza 5, No działki:469/33 Application of the thermal insulation layer of the outer wall, the insulation of the roof by application of the thermal insulation layer, floor insulation of the floor on the ground by application of the thermal insulation layer, replacement of windows, partial replacement of the door, modernisation of the CO system throug...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:0720:07, 10 March 2020DG Regio talk contribs 13,430 bytes +2,427 Created claim: summary (P836): The project concerns the work on the existing infrastructure of the building in Świętoul.Spółdzielcza 5, No działki:469/33 Application of the thermal insulation layer of the outer wall, the insulation of the roof by application of the thermal insulation layer, floor insulation of the floor on the ground by application of the thermal insulation layer, replacement of windows, partial replacement of the door, modernisation of the CO system through...

25 February 2020

18 February 2020

31 January 2020

14 January 2020