Revision history of "Investment in RES in MEBELMAX" (Q132101)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 90,598 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 90,598 bytes −55 Set a claim value: summary (P836): A recorrente tenciona realizar um investimento que implica a instalação de painéis fotovoltaicos na infraestrutura da unidade de produção no município de Barcikowo Dobre Miasto. É fornecido um sistema fotovoltaico com uma potência nominal de 40 kWp (constituído por 125 unidades de módulos monocristalinos com uma potência unitária de 320 W), ligado a uma rede de distribuição diretamente a um sistema elétrico trifásico de baixa tensão. Toda a instalaç...

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5222:52, 2 July 2022DG Regio talk contribs 84,551 bytes +54,138 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 12:2012:20, 2 December 2021DG Regio talk contribs 18,365 bytes +3,048 Created claim: summary (P836): La requérante envisage de réaliser un investissement consistant en l’installation de panneaux photovoltaïques dans l’infrastructure de l’usine de production de Barcikowo, commune de Dobre Miasto. Il existe un système photovoltaïque d’une puissance nominale de 40 kWp (composé de 125 modules monocristallins d’une puissance unitaire de 320 W), relié au réseau de distribution directement à une installation électrique à basse tension triphasée. L’ens...
  • curprev 12:2012:20, 2 December 2021DG Regio talk contribs 15,317 bytes +100 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:5416:54, 21 October 2020DG Regio talk contribs 15,656 bytes +88 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5416:54, 21 October 2020DG Regio talk contribs 15,568 bytes −85 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5416:54, 21 October 2020DG Regio talk contribs 15,653 bytes +2,920 Created claim: summary (P836): The applicant plans to carry out an investment involving installation of photovoltaic panels in the infrastructure of the production plant in Barcikowo commune Dobre Miasto. A photovoltaic system with rated power of 40 kWp (consisting of 125 units of monocrystalline modules with a unit power of 320 W), connected to a distribution network directly to a three-phase low voltage electrical system is provided. The entire installation will be planted...
  • curprev 16:5416:54, 21 October 2020DG Regio talk contribs 12,733 bytes −2,388 Removed claim: summary (P836): The applicant plans to carry out an investment consisting of installing photovoltaic panels in the infrastructure of the production plant in Barcikowo of Dobre Miasto. A photovoltaic system with a nominal output of 40 kWp is foreseen (consisting of 125 unit units of mono-crystalline modules with a unit capacity of 320W), which is connected to the distribution network directly to the three-phase grid of low voltage electrical supply. The entire...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1920:19, 10 March 2020DG Regio talk contribs 13,396 bytes +2,388 Created claim: summary (P836): The applicant plans to carry out an investment consisting of installing photovoltaic panels in the infrastructure of the production plant in Barcikowo of Dobre Miasto. A photovoltaic system with a nominal output of 40 kWp is foreseen (consisting of 125 unit units of mono-crystalline modules with a unit capacity of 320W), which is connected to the distribution network directly to the three-phase grid of low voltage electrical supply. The entire i...

25 February 2020

18 February 2020

31 January 2020

14 January 2020