Revision history of "Construction of micro photovoltaic installations up to 40KWp on sewage treatment plant at ul. Rataja 4 in Reszl and water treatment station at ul. Gdańska 3 in Reszlu." (Q132061)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 90,433 bytes −15 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 90,448 bytes +26 Set a claim value: summary (P836): O investimento previsto consistirá na aquisição e instalação de duas instalações fotovoltaicas com uma capacidade de captura de água de 39,6 kW cada. Gdańska w Reszlu by Wielobranżowe Przedsiębiorstwo Komunalne Sp. z o.o. in Reszl utilizando 132 painéis fotovoltaicos (cada instalação) com uma capacidade de 300 W cada painel. Não é necessária qualquer licença de construção ou decisão ambiental para realizar este investimento. A energia resultante ser...

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 87,664 bytes −841 Changed label, description and/or aliases in it, da, lv, sk, es, ro, cs, fi, et, ga, fr, lt, nl, hu, mt, sv, el, hr, pt, bg, de, sl, and other parts

21 October 2022

2 July 2022

  • curprev 22:5122:51, 2 July 2022DG Regio talk contribs 87,679 bytes +56,279 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 18,624 bytes +3,069 Created claim: summary (P836): L’investissement prévu consistera en l’achat et l’installation de 2 installations photovoltaïques d’une capacité de 39,6 kW chacune sur la prise d’eau à ul. Gdański à Reszl par Wielobranzowe Przedsiębiorstwo Komunalne Sp. z o.o. à Reszl utilisant 132 panneaux photovoltaïques (chaque installation) de 300 W chaque panneau. Aucun permis de construire ou décision environnementale n’est requis pour la mise en œuvre de l’investissement. L’énergie obte...
  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 15,555 bytes +293 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3716:37, 21 October 2020DG Regio talk contribs 15,701 bytes +228 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3716:37, 21 October 2020DG Regio talk contribs 15,473 bytes −222 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3716:37, 21 October 2020DG Regio talk contribs 15,695 bytes +2,839 Created claim: summary (P836): The planned investment will consist of the purchase and installation of 2 photovoltaic installations with a capacity of 39.6 kW each on water capture at ul. Gdańska w Reszlu by Wielobranżowe Przedsiębiorstwo Komunalne Sp. z o.o. in Reszl using 132 photovoltaic panels (each installation) with a capacity of 300 W each panel. No construction permit or environmental decision are required to carry out this investment. The resulting energy will be use...
  • curprev 16:3716:37, 21 October 2020DG Regio talk contribs 12,856 bytes −2,342 Removed claim: summary (P836): The planned investment will consist of the purchase and installation of 2 photovoltaic installations of 39.6 kW each on the basis of water at ul. Gdansk in Reszlu by Wielobrandze Przedsiębiorstwo Komunalne Komunalne Sp. z o.o. in Reszlu using 132 solar panels (each installation) with a power of 300 W. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulti...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1820:18, 10 March 2020DG Regio talk contribs 13,479 bytes +2,342 Created claim: summary (P836): The planned investment will consist of the purchase and installation of 2 photovoltaic installations of 39.6 kW each on the basis of water at ul. Gdansk in Reszlu by Wielobrandze Przedsiębiorstwo Komunalne Komunalne Sp. z o.o. in Reszlu using 132 solar panels (each installation) with a power of 300 W. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulting...

25 February 2020

18 February 2020

31 January 2020

14 January 2020