Revision history of "Construction of photovoltaic farm – Grodzisko 2" (Q132059)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5122:51, 2 July 2022DG Regio talk contribs 79,811 bytes +50,393 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 17,836 bytes +2,958 Created claim: summary (P836): Le cabinet d’avocats «Consulteur» Daniel Gramatowski envisage de construire une installation photovoltaïque de 600 kW ainsi que l’infrastructure technique nécessaire sur le terrain no. 50/3, située dans la zone géodésique de Grodzisko, la commune de Banie Mazurskie, district de Gołdapski, voïvodie de Warmińsko-Mazurskie. Le terrain mentionné ci-dessus est situé à l’extérieur des bâtiments concentrés du village Grodzisko, il n’est pas construit....
  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 14,878 bytes +117 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3716:37, 21 October 2020DG Regio talk contribs 15,200 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3716:37, 21 October 2020DG Regio talk contribs 15,092 bytes −111 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3716:37, 21 October 2020DG Regio talk contribs 15,203 bytes +2,627 Created claim: summary (P836): The law firm “Consultor” Daniel Gramatowski plans to build a photovoltaic installation with a capacity of 600 kW, together with the necessary technical infrastructure, in the area of plot no. 50/3, located within the geodesy area of Grodzisko, the municipality of Banie Mazurskie, Gołdapski county, Warmińsko-Mazurskie voivodship. The plot is located outside the concentrated buildings of the village Grodzisko, it is not built up. The area of plot...
  • curprev 16:3716:37, 21 October 2020DG Regio talk contribs 12,576 bytes −2,287 Removed claim: summary (P836): The “Consultor” Legal Office, Daniel Gramacski, is planning to build a 600 kW photovoltaic power plant with the necessary technical infrastructure, on land parcel No eard. 50/3, located within the boundary of the geodesic to the bulkhead, the municipality of Buń Mazurskie, the powiat (powiat) of the town of Warmińsko-Mazurskie Province, Warmińsko-Mazurskie Province. This parcel is located outside of the agglomeration of the construction of a v...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1820:18, 10 March 2020DG Regio talk contribs 13,140 bytes +2,287 Created claim: summary (P836): The “Consultor” Legal Office, Daniel Gramacski, is planning to build a 600 kW photovoltaic power plant with the necessary technical infrastructure, on land parcel No eard. 50/3, located within the boundary of the geodesic to the bulkhead, the municipality of Buń Mazurskie, the powiat (powiat) of the town of Warmińsko-Mazurskie Province, Warmińsko-Mazurskie Province. This parcel is located outside of the agglomeration of the construction of a vil...

25 February 2020

18 February 2020

31 January 2020

14 January 2020