Revision history of "Installation of a photovoltaic installation of 39,78 kWp" (Q132048)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1104:11, 11 October 2024DG Regio talk contribs 68,685 bytes −18 Changed label, description and/or aliases in pt
  • curprev 04:1104:11, 11 October 2024DG Regio talk contribs 68,703 bytes −16 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma central fotovoltaica com uma capacidade total de 39,78 kWp que produz eletricidade a partir de fontes renováveis (153 painéis x 260Wp e 4 unidades de inversores x 10 kW). Os painéis serão posicionados no telhado da estrutura do sistema de alumínio ligado à cobertura do edifício da escola e ligados a quatro inversores trifásicos com uma potência total de, no mínimo, 37 kW. A energia gerada será sincronizad...

7 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5122:51, 2 July 2022DG Regio talk contribs 64,666 bytes +39,974 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:1909:19, 2 December 2021DG Regio talk contribs 15,729 bytes +2,166 Created claim: summary (P836): Le projet concerne la construction d’une centrale photovoltaïque d’une capacité totale de 39,78 kWp produisant de l’électricité à partir de sources renouvelables (153 panneaux x 260 Wp et 4 onduleurs x 10 kW). Les panneaux seront placés sur le toit d’un système en aluminium fixé à la toiture du bâtiment scolaire et reliés à quatre onduleurs triphasés d’une puissance totale d’au moins 37 kW. L’énergie produite sera synchronisée avec le réseau pub...
  • curprev 09:1909:19, 2 December 2021DG Regio talk contribs 13,563 bytes +139 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 13,863 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 13,748 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 13,858 bytes +2,008 Created claim: summary (P836): The subject of the project is the construction of a photovoltaic power plant with a total capacity of 39.78 kWp producing electricity from renewable sources (153 panels x 260Wp and 4 units of inverters x 10 kW). The panels will be positioned on the roof on the aluminium system structure attached to the roofing of the school building and connected to four three-phase inverters with a total power of min. 37 kW. The generated energy will be synchro...
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 11,850 bytes −1,544 Removed claim: summary (P836): The project involves the construction of a 39,78 kWp photovoltaic power plant producing electricity from renewable sources (153 panels x 260Wp and 4 inverters x 10 kW). Panels will be placed on the roof in a systemic aluminium structure fixed to cover the roof of the school and connected to four three-phase inverters having a total power of at least 37 kW. Energy generated will be synchronised with the public energy network. The electricity pr...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1820:18, 10 March 2020DG Regio talk contribs 11,675 bytes +1,544 Created claim: summary (P836): The project involves the construction of a 39,78 kWp photovoltaic power plant producing electricity from renewable sources (153 panels x 260Wp and 4 inverters x 10 kW). Panels will be placed on the roof in a systemic aluminium structure fixed to cover the roof of the school and connected to four three-phase inverters having a total power of at least 37 kW. Energy generated will be synchronised with the public energy network. The electricity prod...

25 February 2020

18 February 2020

31 January 2020

14 January 2020