Revision history of "Investments in RES in Market Krystynka" (Q132041)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5022:50, 2 July 2022DG Regio talk contribs 78,910 bytes +50,510 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:1809:18, 2 December 2021DG Regio talk contribs 17,423 bytes +2,734 Created claim: summary (P836): La requérante envisage la construction d’une installation photovoltaïque d’une capacité totale de 26,79 kWp de panneaux installés, qui sera installée sur le toit du bâtiment. L’installation prévue se compose de 94 panneaux photovoltaïques polycristallins d’une puissance de 285 W, équipés d’optimiseurs de puissance et d’onduleur. L’objectif de l’installation photovoltaïque prévue est de produire de l’électricité avec les paramètres du réseau élec...
  • curprev 09:1809:18, 2 December 2021DG Regio talk contribs 14,689 bytes +133 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 14,995 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 14,898 bytes −97 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 14,995 bytes +2,642 Created claim: summary (P836): The applicant envisages the construction of a photovoltaic installation with a total capacity of 26.79 kWp installed panels, will be planted on the roof of the building. The designed installation consists of 94 units of polycrystalline photovoltaic panels with a power output of 285 W, equipped with power optimisation and inverter. The task of the designed photovoltaic installation is to generate electricity with the parameters of the electricity...
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 12,353 bytes −2,150 Removed claim: summary (P836): The applicant envisages the construction of a photovoltaic installation with the total installed capacity of 26,79 kWp panels, will be placed on the roof of the building. The design of the installation consists of 94 polycrystalline photovoltaic panels of 285 W, equipped with power optimisation and inverters. The task of the planned PV is to generate electricity for the parameters of the electricity grid and then to install it in the internal...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1820:18, 10 March 2020DG Regio talk contribs 12,777 bytes +2,150 Created claim: summary (P836): The applicant envisages the construction of a photovoltaic installation with the total installed capacity of 26,79 kWp panels, will be placed on the roof of the building. The design of the installation consists of 94 polycrystalline photovoltaic panels of 285 W, equipped with power optimisation and inverters. The task of the planned PV is to generate electricity for the parameters of the electricity grid and then to install it in the internal el...

25 February 2020

18 February 2020

31 January 2020

14 January 2020