Revision history of "Investments in RES in COWIK in Bartoszyce" (Q132014)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 73,648 bytes +407 Changed label, description and/or aliases in da, it, sk, sv, et, bg, hr, lv, ga, fr, cs, ro, el, lt, es, mt, fi, de, hu, pt, nl, sl, and other parts

3 November 2022

21 October 2022

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 16,689 bytes +2,485 Created claim: summary (P836): L’objet du projet est la construction d’une installation photovoltaïque située dans la municipalité de Bartoszyce (12/3 dans la zone cadastrale de Bartoszyce). Installation au sol basée sur des panneaux photovoltaïques polymorphes et photovoltaïques Installation photovoltaïque conçue avec une capacité totale installée de 99,90 kWp en panneaux photovoltaïques, située au sol. L’installation se composera de 333 panneaux photovoltaïques 300 W et 4 p...
  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 14,204 bytes +112 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 14,531 bytes +100 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 14,431 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 14,540 bytes +2,372 Created claim: summary (P836): The subject of the project is the construction of photovoltaic installations located in the Municipality of Bartoszyce (action 12/3 within the Bartoszyce registration area). Ground installation built on polymorphic, photovoltaic panels Designed photovoltaic installation with total installed capacity of 99.90kWp in photovoltaic panels, positioned on the ground. The installation will consist of 333 pieces of photovoltaic panels 300 W and 4 pcs. 25...
  • curprev 16:3616:36, 21 October 2020DG Regio talk contribs 12,168 bytes −1,884 Removed claim: summary (P836): The project consists of the construction of a photovoltaic installation located in the municipality of Bartoszyce (12/3 on Bartoszyce). Outdoor installation constructed on the basis of polymorphic panels, solar photovoltaic design installation with the total installed capacity of 99,90kWp in photovoltaic panels, on the ground. The installation will consist of 333 PV panels of 300 W and 4 units. Inverter 25 kW. Method of implementation: the pro...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1720:17, 10 March 2020DG Regio talk contribs 12,324 bytes +1,884 Created claim: summary (P836): The project consists of the construction of a photovoltaic installation located in the municipality of Bartoszyce (12/3 on Bartoszyce). Outdoor installation constructed on the basis of polymorphic panels, solar photovoltaic design installation with the total installed capacity of 99,90kWp in photovoltaic panels, on the ground. The installation will consist of 333 PV panels of 300 W and 4 units. Inverter 25 kW. Method of implementation: the proje...

25 February 2020

18 February 2020

31 January 2020

14 January 2020