Revision history of "Construction of a photovoltaic farm by the company BOB Energetyk in Olsztyn." (Q132011)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5022:50, 2 July 2022DG Regio talk contribs 78,109 bytes +49,639 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 17,454 bytes +2,745 Created claim: summary (P836): L’investissement couvert par ce projet consiste en la construction d’une centrale photovoltaïque d’une capacité de 1,66 MW, sur le terrain no 28/9, volume 45 à ul. À Olsztyn. Le projet s’inscrit dans le type de projet figurant dans la norme SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations d’énergie solaire (par exemple, capteurs solaires, photovoltaïques) — jusqu’à 2 MWe/MWth. Selon la possibilité décrite dans SzOOP, l’installation ser...
  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 14,709 bytes +131 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,017 bytes +135 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 14,882 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,005 bytes +2,515 Created claim: summary (P836): The investment covered by this project consists of the construction of a photovoltaic power plant with a capacity of 1,66 MW, on plot No 28/9 of 45 at ul. Sielska in Olsztyn. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. The installation in accordance with the possibility described in the SzOOP will serve co...
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 12,490 bytes −2,049 Removed claim: summary (P836): The investment covered by this project consists of the construction of a 1.66 MW photovoltaic power plant on plot No 28/9, at ul. Siena in Olsztyn. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation in accordance with the option described in SzOOP will serve commercial purposes — to construct electricity f...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1720:17, 10 March 2020DG Regio talk contribs 12,814 bytes +2,049 Created claim: summary (P836): The investment covered by this project consists of the construction of a 1.66 MW photovoltaic power plant on plot No 28/9, at ul. Siena in Olsztyn. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation in accordance with the option described in SzOOP will serve commercial purposes — to construct electricity for...

25 February 2020

18 February 2020

31 January 2020

14 January 2020