Revision history of "THE USE OF RENEWABLE ENERGY SOURCES THROUGH THE INSTALLATION OF PHOTOVOLTAIC PANELS AND HEAT PUMPS BY THE COMPANY PENSJONACIK TRADE TRANSPORT CONSTRUCTION MIROSŁAW ANASIŃSKI." (Q132009)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 88,698 bytes +221 Changed label, description and/or aliases in it, da, hr, ga, de, et, pt, lv, fi, lt, fr, sv, es, ro, hu, el, nl, cs, sl, bg, mt, and other parts

3 November 2022

21 October 2022

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 18,643 bytes +3,163 Created claim: summary (P836): L’investissement consiste en la construction d’une centrale photovoltaïque sur le toit d’une capacité de 10,2 kW et l’installation d’une pompe à chaleur à air d’une puissance calorifique de 50 kW (puissance électrique 14,9 kW) sur les parcelles nos 51 et 52/3 à Łajs 6, 10-687 Olsztyn, gm Purda. Le projet s’inscrit dans le type de projet indiqué dans le SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations utilisant l’énergie solaire et terr...
  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 15,480 bytes +289 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,630 bytes +236 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,394 bytes −228 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,622 bytes +2,738 Created claim: summary (P836): The investment consists of the construction of a roof photovoltaic power plant with a capacity of 10.2 kW and the installation of an air pump with heating capacity of 50 kW (electric power 14,9 kW) on plots no.51 and 52/3 at Łajs 6, 10-687 Olsztyn, gm Purda. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – installations using solar and earth energy (e.g. solar collectors, photovoltaics, heat pum...
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 12,884 bytes −2,142 Removed claim: summary (P836): The investment consists of the construction of a rooftop photovoltaic power plant of 10.2 kW and an air assembly of a heat pump with a heating output of 50 kW (electric power of 14.9 kW) on plots Nos 51 and 52/3 at Łajos 6, 10-687 Olsztyn, Gend. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar and earth installations (e.g. solar collectors, photovoltaics, heat pumps) — up to 2 MWe/MWth. The...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1720:17, 10 March 2020DG Regio talk contribs 13,301 bytes +2,142 Created claim: summary (P836): The investment consists of the construction of a rooftop photovoltaic power plant of 10.2 kW and an air assembly of a heat pump with a heating output of 50 kW (electric power of 14.9 kW) on plots Nos 51 and 52/3 at Łajos 6, 10-687 Olsztyn, Gend. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar and earth installations (e.g. solar collectors, photovoltaics, heat pumps) — up to 2 MWe/MWth. The in...

25 February 2020

18 February 2020

31 January 2020

14 January 2020