Revision history of "Construction of the Wilkowo photovoltaic power plant" (Q132004)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:5022:50, 2 July 2022DG Regio talk contribs 85,851 bytes +55,279 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 18,342 bytes +3,073 Created claim: summary (P836): L’investissement couvert par ce projet consiste en la construction de 2 centrales photovoltaïques d’une capacité de 2,0 MW chacune, chacune avec une connexion sur les parcelles suivantes: Wilkowo 1: 106/2, 106/5, 352, 121/8, 107 Wolf 2: 121/8, Connexion électrique: 106/5, 107, 80/4, 79/2, 78, 77, 5. Toutes ces propriétés sont situées dans le no 40, à Wilkowo, la municipalité d’Olsztynek. Le projet s’inscrit dans le type de projet figurant dans l...
  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 15,269 bytes +112 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,596 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,485 bytes −111 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,596 bytes +2,870 Created claim: summary (P836): The investment covered by this project consists of the construction of 2 photovoltaic plants with a capacity of 2,0 MW, each of 1,0 MW with one connection on the following plots: Wilkowo 1: 106/2, 106/5, 352, 121/8, 107 Wilkowo 2: 121/8, Power connector: 106/5, 107, 80/4, 79/2, 78, 77, 5. All of the above-mentioned properties are located within no. 40, in the town of Wilkowo, Olsztynek commune. The project fits into the type of project mentioned...
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 12,726 bytes −2,354 Removed claim: summary (P836): The investment covered by this project consists of the construction of 2 PV power plants with a capacity of 2.0 MW each after 1.0 MW with one connection on the following parcels: Willem 1: 106/2, 106/5, 352, 121/8, 107, Willem 2: 121/8, Power Station: 106/5, 107, 80/4, 79/2, 78, 77, 5. All the above properties are located in No 40, in Wilkowo, municipality of Olsztynek. The project is part of the project type referred to in SzOOP ROP WM 2014-2...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1720:17, 10 March 2020DG Regio talk contribs 13,361 bytes +2,354 Created claim: summary (P836): The investment covered by this project consists of the construction of 2 PV power plants with a capacity of 2.0 MW each after 1.0 MW with one connection on the following parcels: Willem 1: 106/2, 106/5, 352, 121/8, 107, Willem 2: 121/8, Power Station: 106/5, 107, 80/4, 79/2, 78, 77, 5. All the above properties are located in No 40, in Wilkowo, municipality of Olsztynek. The project is part of the project type referred to in SzOOP ROP WM 2014-202...

25 February 2020

18 February 2020

31 January 2020

14 January 2020