Revision history of "Construction of 2 photovoltaic micro-installation by ZPD company Piotr Żemojtel." (Q132002)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:1820:18, 2 March 2023DG Regio talk contribs 79,909 bytes +169 Changed label, description and/or aliases in lv, sk, it, da, fr, et, hu, el, ga, ro, fi, pt, bg, lt, sv, nl, hr, mt, es, sl, cs, and other parts

21 October 2022

27 July 2022

  • curprev 17:4117:41, 27 July 2022DG Regio talk contribs 78,915 bytes +50,097 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 17,555 bytes +2,816 Created claim: summary (P836): L’investissement consiste en l’achat et l’installation de 2 centrales photovoltaïques d’une capacité totale de 79,51 kW. Il sera mis en œuvre en un seul endroit à Godkowo 43 sur la parcelle 88/3 avec une capacité de 39,75 kW et la parcelle 88/15 par 39,76 kW. Les installations occuperont jusqu’à 250 m² de toiture chacune. Le projet s’inscrit dans le type de projet indiqué dans SzOOP pour la mesure 4.1 — installations d’énergie solaire — jusqu’à...
  • curprev 09:2109:21, 2 December 2021DG Regio talk contribs 14,739 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,041 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 14,901 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,010 bytes +2,549 Created claim: summary (P836): The investment consists of the purchase and assembly of 2 photovoltaic power plants with a total capacity of 79.51 kW. It will be carried out in one location in Godków 43 on plot 88/3 with the power of 39.75 kW and plot 88/15 by 39.76 kW. Installations will cover up to 250 m² of roof surface each. The project fits into the type of project mentioned in the SzOOP for action 4.1 – solar energy installations – up to 2 MWe/MWth. The installation in a...
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 12,461 bytes −2,009 Removed claim: summary (P836): The investment consists of the purchase and installation of 2 photovoltaic plants with a total power output of 79.51 kW. It will be carried out in a single location in Godkowo 43 on plot 88/3, with a power of 39.75 kW and a plot of 88/15 by 39.76 kW. Installations will be taken up to 250 m² of roof. The project is part of the project type referred to in SzOOP for Measure 4.1 — Sun-power plants — up to 2 MWe/MWth. The installation as described...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:1720:17, 10 March 2020DG Regio talk contribs 12,757 bytes +2,009 Created claim: summary (P836): The investment consists of the purchase and installation of 2 photovoltaic plants with a total power output of 79.51 kW. It will be carried out in a single location in Godkowo 43 on plot 88/3, with a power of 39.75 kW and a plot of 88/15 by 39.76 kW. Installations will be taken up to 250 m² of roof. The project is part of the project type referred to in SzOOP for Measure 4.1 — Sun-power plants — up to 2 MWe/MWth. The installation as described in...

25 February 2020

18 February 2020

31 January 2020

14 January 2020