Revision history of "Construction of photovoltaic micro-installation in Piecky by EKO-TRANS Kazimierz Ejzemberg" (Q131980)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

21 October 2022

27 July 2022

  • curprev 17:4017:40, 27 July 2022DG Regio talk contribs 84,154 bytes +53,960 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:2009:20, 2 December 2021DG Regio talk contribs 18,178 bytes +3,043 Created claim: summary (P836): L’investissement couvert par ce projet consiste en l’achat et l’installation d’une centrale photovoltaïque sur le toit d’une capacité de 39,875 kW, à Piecky, sur les parcelles 1126/3, 89/51 et 1129/1. Le projet s’inscrit dans le type de projet figurant dans le SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations solaires (par exemple capteurs solaires, photovoltaïques) — jusqu’à 2 MWe/MWth. L’installation selon la possibilité décrite dans...
  • curprev 09:2009:20, 2 December 2021DG Regio talk contribs 15,135 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,421 bytes +149 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,272 bytes −129 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 15,401 bytes +2,730 Created claim: summary (P836): The investment covered by this project consists of the purchase and installation of a photovoltaic roof power plant with a capacity of 39.875 kW, in Piecky, on plots 1126/3, 89/51 and 1129/1 The project fits into the type of project mentioned in SzOOP RPO WiM 2014-2020 for operation 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. The installation according to the possibility described in the SzOOP will...
  • curprev 16:3516:35, 21 October 2020DG Regio talk contribs 12,671 bytes −2,185 Removed claim: summary (P836): The investment covered by this project consists of the purchase and installation of a roof photovoltaic power plant of 39.875 kW, in Pieckos, on plots 1126/3, 89/51 and 1129/1. the project is in line with the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation as described in the SzooP will serve the needs of its own business and be...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4920:49, 10 March 2020DG Regio talk contribs 13,130 bytes +2,185 Created claim: summary (P836): The investment covered by this project consists of the purchase and installation of a roof photovoltaic power plant of 39.875 kW, in Pieckos, on plots 1126/3, 89/51 and 1129/1. the project is in line with the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation as described in the SzooP will serve the needs of its own business and be co...

25 February 2020

18 February 2020

31 January 2020

14 January 2020