Revision history of "Renewable energy sources an opportunity to improve the quality of the environment – photovoltaic cells" (Q131967)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 92,700 bytes +3 Changed label, description and/or aliases in pt
  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 92,697 bytes −46 Set a claim value: summary (P836): O projeto terá por objeto a instalação de uma instalação fotovoltaica no edifício Zakład Energetyki Cieplna em Orzysz Sp. z o.o. (parcela n.o 90/4). Uma instalação com uma potência total de 39,68 kWp será construída nos telhados do edifício. A instalação será composta por 155 módulos fotovoltaicos. Um único módulo terá uma potência nominal de 250 W. Os componentes que trabalham com os módulos serão 5 inversores. A tensão de saída será de corrente al...

7 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 22:1022:10, 2 March 2023DG Regio talk contribs 89,972 bytes +1,439 Changed label, description and/or aliases in da, it, sk, ga, et, pt, mt, lt, fi, bg, lv, ro, sv, fr, de, hr, el, sl, nl, es, hu, cs, and other parts

21 October 2022

2 July 2022

  • curprev 22:4922:49, 2 July 2022DG Regio talk contribs 87,714 bytes +56,181 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2519:25, 2 December 2021DG Regio talk contribs 18,585 bytes +3,095 Created claim: summary (P836): L’objet du projet sera l’installation d’une installation photovoltaïque sur le bâtiment de Zakład Energetyka Cieplna w Orzyszu Sp. z o.o. (numéro 90/4). Une installation d’une capacité totale de 39,68 kWc sera construite sur les toits du bâtiment. L’installation se composera de 155 modules photovoltaïques. Un seul module aura une puissance nominale de 250 W. Les éléments coopérant avec les modules seront 5 onduleurs. La tension du secteur obtenu...
  • curprev 19:2519:25, 2 December 2021DG Regio talk contribs 15,490 bytes +197 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3416:34, 21 October 2020DG Regio talk contribs 15,732 bytes +164 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3416:34, 21 October 2020DG Regio talk contribs 15,568 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3416:34, 21 October 2020DG Regio talk contribs 15,696 bytes +2,910 Created claim: summary (P836): The subject of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplna in Orzysz Sp. z o.o. (No. 90/4 plot). An installation with a total power of 39.68 kWp will be built on the roofs of the building. The installation will consist of 155 photovoltaic modules. A single module will have a rated power of 250 W. The components working with the modules will be 5 inverters. The output voltage wi...
  • curprev 16:3416:34, 21 October 2020DG Regio talk contribs 12,786 bytes −2,385 Removed claim: summary (P836): The object of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplnej w Orzyz Sp. z o.o. (parcel No 90/4). An installation with a total capacity of 39,68 kWp on the roof of the building will be built. The installation will consist of 155 solar modules. The single module will achieve its rated power in the order of 250W. 5 inverters will cooperate with the modules. The generated network...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4920:49, 10 March 2020DG Regio talk contribs 13,459 bytes +2,385 Created claim: summary (P836): The object of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplnej w Orzyz Sp. z o.o. (parcel No 90/4). An installation with a total capacity of 39,68 kWp on the roof of the building will be built. The installation will consist of 155 solar modules. The single module will achieve its rated power in the order of 250W. 5 inverters will cooperate with the modules. The generated network vo...

25 February 2020

18 February 2020

31 January 2020

14 January 2020