Revision history of "Investments in RES in Zakładzie Usług Wodnych sp. z o.o. in Dobry Miasto" (Q131940)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 87,980 bytes +92 Changed label, description and/or aliases in lv, da, it, sk, et, fi, es, ro, pt, ga, hr, fr, el, sv, lt, hu, cs, sl, nl, bg, de, mt, and other parts

21 October 2022

27 July 2022

  • curprev 17:4017:40, 27 July 2022DG Regio talk contribs 87,063 bytes +56,454 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 18,357 bytes +3,025 Created claim: summary (P836): L’installation photovoltaïque prévue, d’une capacité totale de 38,76 kWp, sera située au sol à Kosyń dz. Nos 14/18 et 14/15 (installation motorisée — station de traitement des eaux usées). L’installation conçue se compose de 136 panneaux photovoltaïques polycristallins d’une puissance de 285 W, équipés d’optimiseurs de puissance et de 2 onduleurs. L’objectif de l’installation photovoltaïque prévue est de produire de l’électricité avec les paramè...
  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 15,332 bytes +139 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:3416:34, 21 October 2020DG Regio talk contribs 15,632 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3416:34, 21 October 2020DG Regio talk contribs 15,499 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3416:34, 21 October 2020DG Regio talk contribs 15,643 bytes +2,942 Created claim: summary (P836): The designed photovoltaic installation with total power of 38.76 kWp installed panels will be located on the ground in Kosyń dz. 14/18 and 14/15 (powered facility – sewage treatment plant). The designed installation consists of 136 units of polycrystalline photovoltaic panels with a power output of 285 W, equipped with power optimisations and 2 inverters. The task of the designed photovoltaic installation is to generate electricity with the para...
  • curprev 16:3416:34, 21 October 2020DG Regio talk contribs 12,701 bytes −2,372 Removed claim: summary (P836): The planned PV installation with the total installed capacity of 38,76 kWp panels will be posited on the ground in the city of Kosyń. No 14/18 and 14/15 (facility — waste water treatment plant). The design of the installation consists of 136 polycrystalline PV panels of 285 W equipped with capacity optimisation and 2 inverters. The task of the planned PV is to generate electricity for the parameters of the electricity grid and then to install...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4820:48, 10 March 2020DG Regio talk contribs 13,361 bytes +2,372 Created claim: summary (P836): The planned PV installation with the total installed capacity of 38,76 kWp panels will be posited on the ground in the city of Kosyń. No 14/18 and 14/15 (facility — waste water treatment plant). The design of the installation consists of 136 polycrystalline PV panels of 285 W equipped with capacity optimisation and 2 inverters. The task of the planned PV is to generate electricity for the parameters of the electricity grid and then to install it...

25 February 2020

18 February 2020

31 January 2020

14 January 2020