Revision history of "Creation of a photovoltaic farm in Dębnik" (Q131912)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 73,280 bytes −81 Set a claim value: summary (P836): Este projeto envolve a construção de uma exploração fotovoltaica de 1,979 MW na cidade de Dębnik, no município de Reszel. A recorrente é a EKO PARK XIV Sp. z o.o., que é uma empresa do setor das PME. A área de atividades planeadas está relacionada com um dos tipos de projetos descritos no SzOOP no âmbito do eixo 4.1 – instalações de energia solar – até 2 MWe/MWth. O projeto está previsto para 2019. O custo do investimento inclui a aquisição de: obra...

20 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:4822:48, 2 July 2022DG Regio talk contribs 68,057 bytes +42,314 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 16,331 bytes +2,352 Created claim: summary (P836): Ce projet consiste en la construction d’une ferme photovoltaïque de 1,979 MW à Dębnik, dans la municipalité de Reszel. La requérante est EKO PARK XIV Sp. z o.o., une société du secteur des PME. Le domaine des activités prévues est lié à l’un des types de projets décrits dans le SzOOP au titre de l’axe 4.1 — installations d’énergie solaire — jusqu’à 2 MWe/MWth. Le projet devrait être mis en œuvre en 2019. Les coûts d’investissement comprennent l’...
  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 13,979 bytes +109 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:2816:28, 21 October 2020DG Regio talk contribs 14,309 bytes +101 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2816:28, 21 October 2020DG Regio talk contribs 14,208 bytes −101 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2816:28, 21 October 2020DG Regio talk contribs 14,309 bytes +2,162 Created claim: summary (P836): This project involves the construction of a 1.979 MW photovoltaic farm in the town of Dębnik in the municipality of Reszel. The applicant is EKO PARK XIV Sp. z o.o., which is an enterprise in the SME sector. The area of planned activities is related to one of the types of projects described in the SzOOP under axis 4.1 – solar energy installations – up to 2 MWe/MWth. The project is planned for 2019. The cost of the investment includes the acquisi...
  • curprev 16:2816:28, 21 October 2020DG Regio talk contribs 12,147 bytes −1,674 Removed claim: summary (P836): This project consists of the construction of a 1,979-MW photovoltaic farm in Dębnik in the municipality of Reszel. The applicant is EKO PARK XIV Sp. z o.o., which is an SME. The area of the planned activities is linked to one of the project types described in the OOP under Axis 4.1 — solar energy installations — up to 2 MWe/MWth. The implementation of the project is planned for 2019. the cost of the investment shall consist of the acquisition...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4720:47, 10 March 2020DG Regio talk contribs 12,102 bytes +1,674 Created claim: summary (P836): This project consists of the construction of a 1,979-MW photovoltaic farm in Dębnik in the municipality of Reszel. The applicant is EKO PARK XIV Sp. z o.o., which is an SME. The area of the planned activities is linked to one of the project types described in the OOP under Axis 4.1 — solar energy installations — up to 2 MWe/MWth. The implementation of the project is planned for 2019. the cost of the investment shall consist of the acquisition of...

25 February 2020

18 February 2020

31 January 2020

14 January 2020