Revision history of "Construction of photovoltaic micro-installation by the Service Enterprise Grzegorz Wiszniewski" (Q131889)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

21 October 2022

27 July 2022

  • curprev 17:3917:39, 27 July 2022DG Regio talk contribs 86,516 bytes +55,419 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2819:28, 2 December 2021DG Regio talk contribs 18,448 bytes +3,237 Created claim: summary (P836): L’investissement consiste en l’achat et l’assemblage dans la ville de Olecko,obręb 0002, numéro de département. 265/5, 266/2, 265/3: — installation photovoltaïque de toiture-63 panneaux (monocrystallin) d’une puissance de 18,27 kW avec 2 onduleurs, câblage nécessaire et accessoires. Les panneaux photovoltaïques utilisent le phénomène des photovoltaïques. pour convertir le rayonnement en électr. en. Au moyen de connexions par câble, ils transmett...
  • curprev 19:2819:28, 2 December 2021DG Regio talk contribs 15,211 bytes +160 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:2816:28, 21 October 2020DG Regio talk contribs 15,490 bytes +153 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2816:28, 21 October 2020DG Regio talk contribs 15,337 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2816:28, 21 October 2020DG Regio talk contribs 15,469 bytes +2,791 Created claim: summary (P836): The investment consists of buying and assembling in Olecko, part 0002, no. 265/5, 266/2, 265/3: — photovoltaic roofing system-63panels (monocrystalline) with a power of 18.27 kW with 2 inverters, necessary wiring and accessories. PV panels use photovolts to convert radiation into en. electr. By means of cable connections, they transfer energy to inverters, where the direct current changes to alternating current, the inst. will be connected to th...
  • curprev 16:2816:28, 21 October 2020DG Regio talk contribs 12,678 bytes −2,321 Removed claim: summary (P836): The investment consists of the purchase and assembly in m. Olecko, rim 0002, unit number. 265/5, 266/2, 265/3: — 63KW and 18,27-kW solar photovoltaic installations with 2 inverters, the necessary wiring and fittings. PV panels are used by photovoltaic panels to process radiation to en. electrons. With cable connections, they transmit energy to inverters where alternating current into variable current will be connected to the grid, but due to t...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4720:47, 10 March 2020DG Regio talk contribs 13,273 bytes +2,321 Created claim: summary (P836): The investment consists of the purchase and assembly in m. Olecko, rim 0002, unit number. 265/5, 266/2, 265/3: — 63KW and 18,27-kW solar photovoltaic installations with 2 inverters, the necessary wiring and fittings. PV panels are used by photovoltaic panels to process radiation to en. electrons. With cable connections, they transmit energy to inverters where alternating current into variable current will be connected to the grid, but due to the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020