Revision history of "Use of renewable energy sources in the BioPoint production building in Dźwiejet" (Q131873)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:3420:34, 2 March 2023DG Regio talk contribs 71,613 bytes −845 Changed label, description and/or aliases in da, it, sk, lv, cs, et, el, fr, hu, fi, ga, ro, bg, lt, nl, sv, hr, mt, sl, es, de, pt, and other parts

3 November 2022

21 October 2022

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 16,730 bytes +2,489 Created claim: summary (P836): Le projet concerne l’installation de sources d’énergie renouvelables à Biopoint. Afin d’optimiser le travail de l’usine dans le domaine de la gestion de l’énergie et d’améliorer l’efficacité énergétique, il est prévu d’appliquer: Pompe à chaleur = 42,3 kW Chaudière à eau pour combustibles solides — granulés de bois = 75 kW L’investissement prévoit le remplacement de la source de chaleur existante en une source d’énergie renouvelable. La chaudièr...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 14,241 bytes +168 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1716:17, 21 October 2020DG Regio talk contribs 14,512 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1716:17, 21 October 2020DG Regio talk contribs 14,373 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1716:17, 21 October 2020DG Regio talk contribs 14,516 bytes +2,310 Created claim: summary (P836): The subject of the project is the installation of RES sources in BioPoint. In order to optimise the operation of the plant in the field of energy management and improve energy efficiency, it is planned to use: Heat pump = 42,3 kW Water boiler for solid fuel – wood pellet = 75 kW The investment provides for the replacement of the existing heat source into a source of RES. The existing coal boiler and hot water storage heater will be liquidated. A...
  • curprev 16:1716:17, 21 October 2020DG Regio talk contribs 12,206 bytes −1,757 Removed claim: summary (P836): The project concerns the installation of RES sources in BioPoint. In order to optimise the work of the energy economy establishment and improve energy efficiency, it is planned to apply: Heat pump = 42.3 kW Marine of solid fuel — wood pelet = 75 kW Investment provides for an exchange of an existing heat source for RES. The existing boiler c.o. and the storage water heater will be closed. The brine heat pump shall be installed with a bottom sou...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4620:46, 10 March 2020DG Regio talk contribs 12,255 bytes +1,757 Created claim: summary (P836): The project concerns the installation of RES sources in BioPoint. In order to optimise the work of the energy economy establishment and improve energy efficiency, it is planned to apply: Heat pump = 42.3 kW Marine of solid fuel — wood pelet = 75 kW Investment provides for an exchange of an existing heat source for RES. The existing boiler c.o. and the storage water heater will be closed. The brine heat pump shall be installed with a bottom sourc...

25 February 2020

18 February 2020

31 January 2020

14 January 2020