Revision history of "Increase of production capacity of the forge INPO s.r.o." (Q13187)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

2 July 2022

  • curprev 22:4722:47, 2 July 2022DG Regio talk contribs 48,915 bytes +28,498 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 08:3108:31, 2 December 2021DG Regio talk contribs 16,587 bytes +1,489 Created claim: summary (P836): Das Projekt betrifft die Modernisierung des Produktionsbetriebs von INPO s.r.o. und die Erweiterung seiner Kapazität um neue technologische Einheiten für den Werkzeugbau (Vorbereitung und Bereitstellung des eigenen Schmiedeprozesses) und eine Schmiedewerkstatt (z. B. Metallschmiedearbeiten einschließlich Verarbeitung von Schmieden) mit Schwerpunkt auf Stanzschmiedearbeiten. Die große Auslandsnachfrage (90 % der Produktion) erfordert einen Anstie...
  • curprev 08:3108:31, 2 December 2021DG Regio talk contribs 15,098 bytes +110 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 17:5917:59, 28 November 2021DG Regio talk contribs 14,988 bytes +1,541 Created claim: summary (P836): Le projet porte sur la modernisation de l’exploitation de la production de l’INPO s.r.o. et l’extension de sa capacité à inclure de nouvelles unités technologiques pour l’atelier d’outils (préparation et fourniture de son propre procédé de forgeage) et un atelier de forgeage (p. ex. forgeages métalliques, y compris le traitement des pièces forgées) en mettant l’accent sur les pièces forgées. Une forte demande étrangère (90 % de la production) né...
  • curprev 17:5917:59, 28 November 2021DG Regio talk contribs 13,447 bytes +108 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3416:34, 22 October 2020DG Regio talk contribs 13,792 bytes +1,371 Created claim: summary (P836): The project concerns the modernisation of the production operation of the forge INPO s.r.o. and the extension of its capacities to include new technological units for toolworks (preparation and provision of the own forging process) and forgings (forgings forgings) with a focus on die forgings. Large foreign demand (90 % of production) requires an increase in production volume of aid to purchase 5 new machines and an increase in the number of emp...
  • curprev 16:3416:34, 22 October 2020DG Regio talk contribs 12,421 bytes −903 Removed claim: summary (P836): The project concerns the modernisation of the production operation of the INPO s.r.o. and the extension of its capacity to the new technology plant for the machine tools (preparation and maintenance of its own forging process) and a metal (technology unit, including the processing of forgings) with a focus on the drop outs. Large foreign demand (90 % of production) requires an increase in the production of 5 new machines and 6 employees. A com...
  • curprev 07:4307:43, 22 October 2020DG Regio talk contribs 13,324 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:4307:43, 22 October 2020DG Regio talk contribs 13,209 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

19 June 2020

6 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 11:2811:28, 25 February 2020DG Regio talk contribs 11,626 bytes +903 Created claim: summary (P836): The project concerns the modernisation of the production operation of the INPO s.r.o. and the extension of its capacity to the new technology plant for the machine tools (preparation and maintenance of its own forging process) and a metal (technology unit, including the processing of forgings) with a focus on the drop outs. Large foreign demand (90 % of production) requires an increase in the production of 5 new machines and 6 employees. A commi...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020