Revision history of "Expansion of photovoltaic farm – Grodzisko" (Q131840)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 22:4622:46, 2 July 2022DG Regio talk contribs 83,414 bytes +53,466 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 18,020 bytes +3,022 Created claim: summary (P836): Le cabinet d’avocats «Consulteur» Daniel Gramatowski assume l’extension de l’installation photovoltaïque existante avec des panneaux d’une capacité totale de 0,39 MW, installés au sol avec l’infrastructure technique nécessaire, sur le site du terrain no ewid. 368/2, située dans la zone géodésique de Grodzisko, municipalité de Banie Mazurskie, district de Gołdapski, voïvodie de Warmińsko-Mazurskie. La parcelle susmentionnée est située à l’extérie...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 14,998 bytes +110 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 15,327 bytes +103 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 15,224 bytes −106 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 15,330 bytes +2,755 Created claim: summary (P836): The law firm “Consultor” Daniel Gramatowski assumes the extension of the existing photovoltaic installation with panels with a total capacity of 0.39 MW, mounted on the ground together with the necessary technical infrastructure, on the premises of the register plot. 368/2, located within the geodesy area of Grodzisko, the municipality of Banie Mazurskie, Gołdapski county, Warmińsko-Mazurskie voivodship. The plot is located outside the village o...
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 12,575 bytes −2,346 Removed claim: summary (P836): The “Consultor”, “Consultor”, is intended to extend the existing photovoltaic installation to panels with a total capacity of 0.39 MW, mounted on the land together with the necessary technical infrastructure, on land parcel No eard. 368/2, located within the boundary of the geodesic to the bulkhead, the municipality of Buń Mazurskie, the powiat (powiat) of the town of Warmińsko-Mazurskie Province, Warmińsko-Mazurskie Province. The parcel is lo...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4520:45, 10 March 2020DG Regio talk contribs 13,198 bytes +2,346 Created claim: summary (P836): The “Consultor”, “Consultor”, is intended to extend the existing photovoltaic installation to panels with a total capacity of 0.39 MW, mounted on the land together with the necessary technical infrastructure, on land parcel No eard. 368/2, located within the boundary of the geodesic to the bulkhead, the municipality of Buń Mazurskie, the powiat (powiat) of the town of Warmińsko-Mazurskie Province, Warmińsko-Mazurskie Province. The parcel is loca...

25 February 2020

18 February 2020

31 January 2020

14 January 2020