Revision history of "“The use of renewable energy sources in the hotel building”Mazurski Raj“in Piaski”" (Q131836)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1104:11, 11 October 2024DG Regio talk contribs 88,323 bytes −1 Changed label, description and/or aliases in pt
  • curprev 04:1104:11, 11 October 2024DG Regio talk contribs 88,324 bytes +265 Set a claim value: summary (P836): O objeto do projeto é a instalação de duas bombas de calor com uma potência de 70 kW cada. A instalação também requer 36 unidades de perfuração para profundidade. 100 m, condutas que ligam sondas com colectores, poços agregados 8, 9 e 10 sequenciais, 2 kpl colonizadores contaminam., sensor de temperatura externo, instalação de 2 bombas de circulação de fonte inferior, 2 bombas de circulação Grundfos, instalações sanitárias e de medição e terraplenag...

12 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 85,301 bytes −5,939 Changed label, description and/or aliases in lv, it, da, sk, ro, fr, fi, sv, hr, et, ga, sl, lt, de, hu, pt, bg, nl, es, mt, cs, el, and other parts

21 October 2022

2 July 2022

  • curprev 22:4622:46, 2 July 2022DG Regio talk contribs 90,421 bytes +58,639 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 18,818 bytes +3,284 Created claim: summary (P836): L’objet du projet est l’installation de 2 pompes à chaleur d’une puissance de 70 kW chacune. L’installation nécessite également 36 trous de forage. 100 m, construction de canalisations reliant les sondes avec collecteurs, puits collecteurs 8, 9 et 10 séquences., 2 ensembles de colons que vous contaminerez., capteur de température externe, installation de 2 pompes de circulation source inférieure, 2 pompes à circulation Grundfos, sanitaires et de...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 15,534 bytes +175 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 15,798 bytes +149 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 15,649 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 15,801 bytes +2,985 Created claim: summary (P836): The subject of the project is the installation of 2 heat pumps with a power of 70 kW each. The installation also requires 36 drilling units for depth. 100 m, pipelines connecting probes with manifolds, aggregate wells 8, 9 and 10 sequentials, 2 kpl settlers will contaminate., external temperature sensor, installation of 2 lower source circulating pumps, 2 Grundfos circulating pumps, sanitary and measuring fittings and earthworks. The system will...
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 12,816 bytes −2,277 Removed claim: summary (P836): The project is designed to install 2 heat pumps with a power output of 70 kW each. The installation also requires the execution of 36 well drilling wells. 100 m, pipelines connecting the probes to collectors, bulk wells 8, 9 and 10 sequence c., 2 kpl of air pollution sludge, sensor temperature sensor, installation of 2 lower source cycle pumps, 2 sides of the Grundfos, taps and taps and earthworks. The system will work as a cascade. The implem...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4520:45, 10 March 2020DG Regio talk contribs 13,372 bytes +2,277 Created claim: summary (P836): The project is designed to install 2 heat pumps with a power output of 70 kW each. The installation also requires the execution of 36 well drilling wells. 100 m, pipelines connecting the probes to collectors, bulk wells 8, 9 and 10 sequence c., 2 kpl of air pollution sludge, sensor temperature sensor, installation of 2 lower source cycle pumps, 2 sides of the Grundfos, taps and taps and earthworks. The system will work as a cascade. The implemen...

25 February 2020

18 February 2020

31 January 2020

14 January 2020