Revision history of "Installation of 5 photovoltaic power plants with a total capacity of 60.71 kW and installation of 9 heat pumps with a total capacity of 80.51 kW by the Cooperative Bank in Szczytno" (Q131835)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 93,506 bytes −439 Changed label, description and/or aliases in lv, da, ro, it, bg, sk, et, hr, ga, lt, fi, nl, sl, fr, sv, es, de, el, hu, mt, cs, pt, and other parts

21 October 2022

27 July 2022

  • curprev 17:3817:38, 27 July 2022DG Regio talk contribs 92,749 bytes +58,518 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

3 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 23,156 bytes +3,126 Created claim: summary (P836): L’investissement couvert par ce projet consiste à lancer des centrales photovoltaïques d’une capacité totale de 60,71 kW et à installer 9 pompes à chaleur d’une capacité totale de 80,51 kW à Wielbark, Pasymi, Purda, Cranes, Peaks et soie. Le projet répond à toutes les conditions limites fixées dans le SzOOP ROP WiM 2014-2020. Le demandeur possède des documents de connexion valides au réseau électrique. Le projet en question ne nécessite pas de n...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 20,030 bytes +255 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 20,214 bytes +240 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 19,974 bytes −226 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 20,200 bytes +2,835 Created claim: summary (P836): The investment covered by this project consists of the launch of photovoltaic power plants with a total capacity of 60.71 kW and the assembly of 9 heat pumps with a total capacity of 80.51 kW in Wielbark, Pasymi, Purda, Dźwiejet, Szczytnie, and silk. The project meets all the shore conditions specified in the SHOOP RPO WiM 2014-2020. The applicant shall have valid connection documents to the power grid. This project does not require construction...
  • curprev 16:1616:16, 21 October 2020DG Regio talk contribs 17,365 bytes −2,447 Removed claim: summary (P836): The investment covered by this project consists of the commissioning of a PV power plant with a total capacity of 60.71 kW and a total of 9 kW heat pumps with a total power of 80.51 kW in Wielbarku, Pasimiu, Purda, Dźwizuty, Szczytno, and Jednog. The project fulfils all the conditions laid down in the SzocOP ROP WiM 2014-2020. The applicant shall have valid supporting documents for the energy network. The project does not require construction...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4520:45, 10 March 2020DG Regio talk contribs 16,026 bytes +2,447 Created claim: summary (P836): The investment covered by this project consists of the commissioning of a PV power plant with a total capacity of 60.71 kW and a total of 9 kW heat pumps with a total power of 80.51 kW in Wielbarku, Pasimiu, Purda, Dźwizuty, Szczytno, and Jednog. The project fulfils all the conditions laid down in the SzocOP ROP WiM 2014-2020. The applicant shall have valid supporting documents for the energy network. The project does not require construction re...

25 February 2020

18 February 2020

31 January 2020

14 January 2020