Revision history of "Installation of photovoltaic installation on the economic building of the “Domini” company in Rychnovo" (Q131833)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3616:36, 10 October 2024DG Regio talk contribs 60,976 bytes +2 Changed label, description and/or aliases in pt
  • curprev 16:3616:36, 10 October 2024DG Regio talk contribs 60,974 bytes −55 Set a claim value: summary (P836): O projeto consiste na montagem de uma instalação fotovoltaica num edifício económico situado em Rychnów 36, no terreno n.o 31/2 r. Oh, é rícnico. A central solar será composta por 153 (cada 260Wp) painéis fotovoltaicos policristalinos com uma potência total de 39,78 kWp. Um único módulo é composto por 60 células policristalinas ligadas em série. Os módulos serão equipados com pelo menos três diodos bypass. Eficiência do módulo – pelo menos 15,50 %....

7 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 19:4819:48, 2 March 2023DG Regio talk contribs 58,271 bytes +76 Changed label, description and/or aliases in da, lv, it, sk, ro, pt, fi, ga, et, sv, es, hr, fr, el, nl, hu, sl, cs, bg, de, mt, lt, and other parts

21 October 2022

2 July 2022

  • curprev 22:4622:46, 2 July 2022DG Regio talk contribs 57,370 bytes +34,863 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 14,873 bytes +1,784 Created claim: summary (P836): Le projet consiste en l’installation d’une installation photovoltaïque sur un bâtiment agricole situé à Rychnów 36, sur le terrain no 31/2 rp. C’est Rychnowo. La centrale solaire se composera de 153 panneaux photovoltaïques polycristallins (de 260 Wp chacun) d’une capacité totale de 39,78 kWc. Un module unique se compose de 60 cellules polycristallines reliées à la série. Les modules seront équipés d’au moins trois diodes de contournement. Effic...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 13,089 bytes +177 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1516:15, 21 October 2020DG Regio talk contribs 13,351 bytes +166 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1516:15, 21 October 2020DG Regio talk contribs 13,185 bytes −165 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1516:15, 21 October 2020DG Regio talk contribs 13,350 bytes +1,699 Created claim: summary (P836): The project consists of assembling a photovoltaic installation on an economic building located in Rychnów 36, on plot No 31/2 r. Oh, it’s rychnical. The solar power plant will consist of 153 (each 260Wp) polycrystalline photovoltaic panels with a total power of 39.78 kWp. A single module consists of 60 serially connected polycrystalline cells. The modules will be equipped with at least three bypass diodes. Efficiency of the module – at least 15,...
  • curprev 16:1516:15, 21 October 2020DG Regio talk contribs 11,651 bytes −1,228 Removed claim: summary (P836): The project consists of the installation of a photovoltaic installation on an economic building located in Rychnów 36 on plot No 31/2. Rychnowa. The solar plant will be composed of 153 (each 260Wp) polycrystalline photovoltaic panels with a combined output of 39,78 kWp. A single module consists of 60 series combined polycrystalline cells. The modules will be equipped with at least three arm passes. Module efficiency — minimum 15.50 %. Panels w...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4520:45, 10 March 2020DG Regio talk contribs 11,156 bytes +1,228 Created claim: summary (P836): The project consists of the installation of a photovoltaic installation on an economic building located in Rychnów 36 on plot No 31/2. Rychnowa. The solar plant will be composed of 153 (each 260Wp) polycrystalline photovoltaic panels with a combined output of 39,78 kWp. A single module consists of 60 series combined polycrystalline cells. The modules will be equipped with at least three arm passes. Module efficiency — minimum 15.50 %. Panels wil...

25 February 2020

18 February 2020

31 January 2020

14 January 2020