Revision history of "Construction of Surbay photovoltaic terrestrial installations up to 0,5 MW" (Q131832)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 68,018 bytes −25 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 68,043 bytes −102 Set a claim value: summary (P836): O projeto pressupõe a construção da região de Surbajny na parte da parcela 73, a bacia de instalação fotovoltaica para a produção de eletricidade, juntamente com as infraestruturas técnicas necessárias. A central elétrica instalada prevista não pode exceder 0,5 MW. A área máxima de construção não pode exceder 1 hectares. Além disso, o serviço de comunicação da área de investimento será realizado através de uma saída da estrada comum na parcela n.o 7...

7 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 22:5722:57, 2 March 2023DG Regio talk contribs 65,387 bytes −209 Changed label, description and/or aliases in it, sk, da, ga, fr, fi, et, bg, sl, lv, pt, de, cs, ro, hu, es, sv, lt, hr, nl, mt, el, and other parts

21 October 2022

27 July 2022

  • curprev 17:3817:38, 27 July 2022DG Regio talk contribs 64,774 bytes +38,144 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 16,861 bytes +2,449 Created claim: summary (P836): La plantation suppose la construction d’une installation photovoltaïque pour la production d’électricité, ainsi que l’infrastructure technique nécessaire, sur une partie de la parcelle 73 de Surbajny. La puissance installée prévue de la centrale ne dépassera pas 0,5 MW. La superficie maximale du bâtiment ne doit pas dépasser 1 ha. En outre, le service de transport du site d’investissement sera effectué au moyen d’une sortie de la route municipal...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 14,412 bytes +167 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1516:15, 21 October 2020DG Regio talk contribs 14,684 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1516:15, 21 October 2020DG Regio talk contribs 14,551 bytes −185 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1516:15, 21 October 2020DG Regio talk contribs 14,736 bytes +2,007 Created claim: summary (P836): The project assumes the construction of the Surbajny region on the part of plot 73, the basin of photovoltaic installation for the production of electricity together with the necessary technical infrastructure. The planned installed power plant shall not exceed 0,5 MW. The maximum area of construction shall not exceed 1 hectares. In addition, the communication service of the investment area will be carried out by means of a exit from the communa...
  • curprev 16:1516:15, 21 October 2020DG Regio talk contribs 12,729 bytes −1,398 Removed claim: summary (P836): The plans for the construction of a plot of land 73 by the Surbain area are assumed to be taken into account, as well as the desirability of installing a photovoltaic power for the production of electricity, together with the accompanying technical infrastructure. The planned installed electrical capacity of the electorate shall not exceed 0.5 MW. The maximum building area shall not exceed 1 ha. In addition, the area of communication of the ar...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4520:45, 10 March 2020DG Regio talk contribs 12,407 bytes +1,398 Created claim: summary (P836): The plans for the construction of a plot of land 73 by the Surbain area are assumed to be taken into account, as well as the desirability of installing a photovoltaic power for the production of electricity, together with the accompanying technical infrastructure. The planned installed electrical capacity of the electorate shall not exceed 0.5 MW. The maximum building area shall not exceed 1 ha. In addition, the area of communication of the area...

25 February 2020

18 February 2020

31 January 2020

14 January 2020