Revision history of "Construction of photovoltaic micro-installation by the company “Wojciech Makowski i Bogusław Milewski” – Public Company" (Q131809)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1104:11, 11 October 2024DG Regio talk contribs 93,121 bytes −2 Changed label, description and/or aliases in pt
  • curprev 04:1104:11, 11 October 2024DG Regio talk contribs 93,123 bytes +29 Set a claim value: summary (P836): O investimento consiste na aquisição e instalação de microinstalações fotovoltaicas. O projeto enquadra-se no tipo de projeto mencionado no SzOOP RPO WiM 2014-2020 para a ação 4.1 — instalações de energia solar (por exemplo, coletores solares, energia fotovoltaica) — até 2 MWe/MWth. As instalações servirão as suas próprias necessidades e serão ligadas à rede, no entanto devido à capacidade da instalação (até 40 kW), em conformidade com o artigo 5.o...

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 90,336 bytes +458 Changed label, description and/or aliases in lv, sk, da, it, fi, fr, hu, et, pt, ga, cs, sl, bg, ro, lt, hr, nl, es, sv, mt, el, de, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4622:46, 2 July 2022DG Regio talk contribs 88,206 bytes +57,067 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 18,565 bytes +3,152 Created claim: summary (P836): L’investissement consiste en l’achat et l’installation d’une micro-installation photovoltaïque. Le projet s’inscrit dans le type de projet figurant dans la norme SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations d’énergie solaire (par exemple, capteurs solaires, photovoltaïques) — jusqu’à 2 MWe/MWth. Les installations répondront à leurs propres besoins et seront raccordées au réseau, cependant en raison de la capacité de l’installation...
  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 15,413 bytes +173 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,679 bytes +186 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,493 bytes −154 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,647 bytes +2,818 Created claim: summary (P836): The investment consists of the purchase and installation of photovoltaic micro-installations. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. Installations will serve their own needs and will be connected to the grid, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of...
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 12,829 bytes −2,322 Removed claim: summary (P836): The investment consists of the purchase and installation of a micro-PV. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. Installations will serve specific needs and will be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of La...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4420:44, 10 March 2020DG Regio talk contribs 13,426 bytes +2,322 Created claim: summary (P836): The investment consists of the purchase and installation of a micro-PV. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. Installations will serve specific needs and will be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of Laws...

25 February 2020

18 February 2020

31 January 2020

14 January 2020