Revision history of "Construction of a photovoltaic power plant with the necessary infrastructure in Kruszewnia" (Q131807)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 91,818 bytes +3 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 91,815 bytes −28 Set a claim value: summary (P836): o investimento abrangido por este projeto consiste na construção de uma central fotovoltaica com uma capacidade de 0,999 MW, juntamente com a construção de uma ligação elétrica com um comprimento de 17 m. O projeto enquadra-se no tipo de projeto mencionado no SzOOP RPO WiM 2014-2020 para a operação 4.1 — instalações de energia solar (por exemplo, coletores solares, fotovoltaicos) — até 2 MWe/MWth. A instalação em conformidade com a possibilidade des...

20 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4622:46, 2 July 2022DG Regio talk contribs 86,464 bytes +55,660 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 18,445 bytes +3,105 Created claim: summary (P836): L’investissement couvert par ce projet consiste en la construction d’une centrale photovoltaïque d’une capacité de 0,999 MW, ainsi que la construction d’une connexion électrique de 17 m de long. Le projet s’inscrit dans le type de projet indiqué dans le SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations solaires (par exemple capteurs solaires, photovoltaïques) — jusqu’à 2 MWe/MWth. Selon la possibilité décrite dans SzOOP, l’installation...
  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 15,340 bytes +156 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,623 bytes +149 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,474 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,636 bytes +2,844 Created claim: summary (P836): the investment covered by this project consists of the construction of a photovoltaic power plant with a capacity of 0.999 MW together with the construction of a power connection with a length of 17 m. The project fits into the type of project mentioned in SzOOP RPO WiM 2014-2020 for operation 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. The installation in accordance with the possibility described...
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 12,792 bytes −2,336 Removed claim: summary (P836): the investment covered by this project consists of the construction of a 0,999-MW photovoltaic power plant with the construction of an electricity connection of 17 m long. the project is part of the project type referred to in SzOOP ROP WiM 2014-2020 for activity 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation in accordance with the option described in SzOOP will serve commercial purposes —...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4420:44, 10 March 2020DG Regio talk contribs 13,401 bytes +2,336 Created claim: summary (P836): the investment covered by this project consists of the construction of a 0,999-MW photovoltaic power plant with the construction of an electricity connection of 17 m long. the project is part of the project type referred to in SzOOP ROP WiM 2014-2020 for activity 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation in accordance with the option described in SzOOP will serve commercial purposes — to...

25 February 2020

18 February 2020

31 January 2020

14 January 2020