Revision history of "Application of the heat pump company Bartbo – Bartosz Bogucki – social building" (Q131805)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 83,923 bytes −2,513 Changed label, description and/or aliases in lv, it, fr, bg, da, sv, sk, cs, ro, fi, et, pt, de, es, mt, el, hr, nl, ga, lt, sl, hu, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 17:3817:38, 27 July 2022DG Regio talk contribs 84,761 bytes +54,503 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 18,088 bytes +2,983 Created claim: summary (P836): L’investissement est prévu sur la parcelle no 574/2 à Butryny. L’objet du projet est la construction d’une jonction thermique dans un bâtiment d’entreprise. Le demandeur dispose d’une notification des travaux géologiques. L’objectif du projet est de réduire la consommation d’énergie et les émissions de composés nocifs dans l’atmosphère en utilisant un nœud écologique et économique basé sur les SER. À cette fin, la construction d’un nœud thermiqu...
  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 15,105 bytes +147 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,397 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,255 bytes −124 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,379 bytes +2,798 Created claim: summary (P836): The investment is planned on plot no. 574/2 in Butryny. The subject of the project is the construction of a heat node in the company building. The applicant shall have a declaration of geological works. The aim of the project is to reduce energy consumption and emissions of harmful compounds into the atmosphere by using an ecological and economical node based on RES.For this purpose, the construction of a heat node with a renewable heat source i...
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 12,581 bytes −2,291 Removed claim: summary (P836): The investment is planned on plot No 574/2 in the town of Butin. The object of the project is the construction of a heat interchange in the company building. The applicant shall have a notification of the geological works. The project aims to achieve a reduction in the energy consumption and emissions of harmful compounds into the atmosphere by applying an organic and cost-effective node based on OZE.To this end, a heat pump is designed to be...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4420:44, 10 March 2020DG Regio talk contribs 13,162 bytes +2,291 Created claim: summary (P836): The investment is planned on plot No 574/2 in the town of Butin. The object of the project is the construction of a heat interchange in the company building. The applicant shall have a notification of the geological works. The project aims to achieve a reduction in the energy consumption and emissions of harmful compounds into the atmosphere by applying an organic and cost-effective node based on OZE.To this end, a heat pump is designed to be bu...

25 February 2020

18 February 2020

31 January 2020

14 January 2020