Revision history of "Investments in RES in the Groves" (Q131803)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 90,536 bytes −16 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 90,552 bytes +16 Set a claim value: summary (P836): O objeto do projeto é a construção de 3 instalações fotovoltaicas com potência até 39,76 kW cada, localizadas no município de Płosnica (SUW Płonica Dz. nr. 462/2, ul. Lipowa 9, estação de tratamento de águas residuais n.o 88/6, ul. Kościelna14, SUW Jabłonowoowo 111, Dz. No 856) Cada uma das 3 instalações contém: 1. Painéis fotovoltaicos ou monocristalinos na quantidade de 142 unidades de 280 Wp, classe de células A, com a garantia da potência nomina...

23 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

27 July 2022

  • curprev 17:3817:38, 27 July 2022DG Regio talk contribs 85,796 bytes +54,971 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 18,336 bytes +3,184 Created claim: summary (P836): L’objet du projet est la construction de 3 installations photovoltaïques d’une puissance maximale de 39,76 kW chacune situées dans la commune de Płośnica (SUW Płośnica dz. no 462/2, ul. Lipowa 9, station d’épuration de Płośnica no 88/6, ul. Kościelna14, SUW Jabłonowo 111, dz. No 856) Chacune des 3 installations comprend: 1. Panneaux PV ou monocristallins d’une quantité de 142 pièces d’une puissance de 280 Wp, cellule de classe A, avec la garanti...
  • curprev 19:2419:24, 2 December 2021DG Regio talk contribs 15,152 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,454 bytes +91 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,363 bytes −96 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,459 bytes +2,824 Created claim: summary (P836): The subject of the project is the construction of 3 photovoltaic installations with power up to 39.76 kW each located in the Płosnica Municipality (SUW Płonica Dz. nr. 462/2, ul. Lipowa 9, sewage treatment plant No. 88/6, ul. Kościelna14, SUW Jabłonowoowo 111, Dz. No. 856) Each of the 3 installations contains: 1. PV or monocrystalline panels in the amount of 142 units of 280 Wp, cell class A, with the guarantee of the rated power of the photovol...
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 12,635 bytes −2,388 Removed claim: summary (P836): The object of the project is the construction of 3 PV installations with a capacity of up to 39.76 kW each located in the Gmina Plantnica (SUW School, op. No 462/2, ul. Lipowa 9, Wastewater Treatment Plant No 88/6, ul. Kościelna14, SUW Jabłonowo 111, op. No 856) Any of the 3 installations include: 1. PV or mono-crystalline panels in quantities of 142 units with a capacity of 280 Wp., A class of cells, with a warranty of the rated photovoltaic...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:4420:44, 10 March 2020DG Regio talk contribs 13,304 bytes +2,388 Created claim: summary (P836): The object of the project is the construction of 3 PV installations with a capacity of up to 39.76 kW each located in the Gmina Plantnica (SUW School, op. No 462/2, ul. Lipowa 9, Wastewater Treatment Plant No 88/6, ul. Kościelna14, SUW Jabłonowo 111, op. No 856) Any of the 3 installations include: 1. PV or mono-crystalline panels in quantities of 142 units with a capacity of 280 Wp., A class of cells, with a warranty of the rated photovoltaic mo...

25 February 2020

18 February 2020

31 January 2020

14 January 2020