Revision history of "Use of RES in municipal economy" (Q131796)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2506:25, 9 October 2024DG Regio talk contribs 82,312 bytes +3 Changed label, description and/or aliases in pt
  • curprev 06:2506:25, 9 October 2024DG Regio talk contribs 82,309 bytes −18 Set a claim value: summary (P836): A opção selecionada diz respeito à instalação de painéis fotovoltaicos na infraestrutura da recorrente existente no município de Stawiguda: parcela n.o 270/7 e 270/15 zona 12, na estação de tratamento de águas residuais – instalação terrestre. Descrição tecnológica e optimização das soluções de instalação fotovoltaica. A instalação com capacidade instalada de 156 kWp será ligada a uma rede de distribuição num sistema trifásico 230/400 (3/N/PE). Módu...

12 March 2024

15 January 2024

13 December 2023

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 78,792 bytes +886 Changed label, description and/or aliases in da, it, sk, ga, lv, sv, cs, es, de, lt, et, fi, ro, bg, el, hr, mt, nl, fr, pt, hu, sl, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4522:45, 2 July 2022DG Regio talk contribs 76,226 bytes +48,303 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2819:28, 2 December 2021DG Regio talk contribs 17,043 bytes +2,650 Created claim: summary (P836): L’option retenue concerne l’installation de panneaux photovoltaïques dans l’infrastructure existante de la requérante dans la municipalité de Stawiguda: parcelle 270/7 et 270/15 Division 12, sur le site de la station d’épuration — Installation du terrain. Description technique et optimisation des solutions d’installation photovoltaïque. L’installation d’une capacité installée de 156 kWp sera raccordée au réseau de distribution dans un système tr...
  • curprev 19:2819:28, 2 December 2021DG Regio talk contribs 14,393 bytes +108 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 14,724 bytes +90 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 14,634 bytes −99 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 14,733 bytes +2,546 Created claim: summary (P836): The selected option concerns the installation of photovoltaic panels in the existing applicant’s infrastructure in the Stawiguda Municipality: plot No. 270/7 and 270/15 area 12, in the sewage treatment plant – Land installation. Technological description and optimisation of photovoltaic installation solutions. The installation with installed capacity of 156 kWp will be connected to a distribution network in a three-phase system 230/400 (3/N/PE)....
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 12,187 bytes −2,067 Removed claim: summary (P836): The selected option concerns the installation of solar panels in the existing infrastructure of the Applicant in the municipality of Staviguda: plot Nos 270/7 and 270/15 of 12, at the waste water treatment plant — land installation. Description of technology, including optimisation of the photovoltaic installation. An installation with an installed capacity of 156 kWp will be connected to the three-phase 230/400 distribution network (3/N/PE)....

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3520:35, 10 March 2020DG Regio talk contribs 12,530 bytes +2,067 Created claim: summary (P836): The selected option concerns the installation of solar panels in the existing infrastructure of the Applicant in the municipality of Staviguda: plot Nos 270/7 and 270/15 of 12, at the waste water treatment plant — land installation. Description of technology, including optimisation of the photovoltaic installation. An installation with an installed capacity of 156 kWp will be connected to the three-phase 230/400 distribution network (3/N/PE). Po...

25 February 2020

18 February 2020

31 January 2020

14 January 2020