Revision history of "Construction and assembly of free-standing photovoltaic panels with total power up to 1000 kW together with the necessary infrastructure" (Q131791)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 89,470 bytes +3 Changed label, description and/or aliases in pt
  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 89,467 bytes −138 Set a claim value: summary (P836): O projeto diz respeito à criação de uma exploração fotovoltaica com uma potência total até 1000 kW. Âmbito de aplicação material: Construção de instalações eléctricas, Entrega e montagem de Inversores, Entrega e montagem de módulos fotovoltaicos, Fiação e protecção contra sobretensão, Ligação e protecção energética, Sistemas de estruturas de apoio, Lançamento de quinta fotovoltaica, Controlo e diagnóstico de instalação, Supervisão no projecto. Modo...

7 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 16:4016:40, 2 March 2023DG Regio talk contribs 86,847 bytes +1,505 Changed label, description and/or aliases in it, da, bg, sk, el, lv, ro, sl, ga, pt, cs, et, fi, de, hr, es, sv, lt, hu, nl, mt, fr, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 17:3817:38, 27 July 2022DG Regio talk contribs 83,670 bytes +53,234 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2819:28, 2 December 2021DG Regio talk contribs 18,103 bytes +3,015 Created claim: summary (P836): Le projet concerne la création d’une ferme photovoltaïque d’une puissance totale allant jusqu’à 1 000 kW. Champ d’application matériel: Construction d’installations électriques, Fourniture et assemblage d’onduleurs, Livraison et assemblage de modules photovoltaïques, Câblage et protection contre les surtensions, Connexion et protection énergétique, Systèmes de structures de soutien, Démarrage de l’exploitation photovoltaïque, Surveillance et dia...
  • curprev 19:2819:28, 2 December 2021DG Regio talk contribs 15,088 bytes +217 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,310 bytes +196 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,114 bytes −185 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 15,299 bytes +2,679 Created claim: summary (P836): The project concerns the creation of a photovoltaic farm with a total power of up to 1000 kW. Material scope: Construction of electrical installations, Delivery and assembly of Inverters, Delivery and assembly of PV modules, Wiring and overvoltage protection, Connection and energy protection, Support structures systems, Launch of photovoltaic farm, Control and diagnostics of Installation, Supervision in the project. Method of implementation: The...
  • curprev 16:1016:10, 21 October 2020DG Regio talk contribs 12,620 bytes −2,244 Removed claim: summary (P836): The project concerns the creation of a PV farm with a total capacity of up to 1 000 kW. Material scope: Construction of electrical installations, supply and assembly of inverters, supply and assembly of PV modules, cabling and anti-surge protection, connection and energy security, connection and support systems, building systems, installation of a photovoltaic farm, monitoring and diagnostic facilities, monitoring in design. Method of implemen...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3520:35, 10 March 2020DG Regio talk contribs 13,142 bytes +2,244 Created claim: summary (P836): The project concerns the creation of a PV farm with a total capacity of up to 1 000 kW. Material scope: Construction of electrical installations, supply and assembly of inverters, supply and assembly of PV modules, cabling and anti-surge protection, connection and energy security, connection and support systems, building systems, installation of a photovoltaic farm, monitoring and diagnostic facilities, monitoring in design. Method of implementa...

25 February 2020

18 February 2020

31 January 2020

14 January 2020