Revision history of "Installation of 30 kW and 40 kW photovoltaic installations" (Q131770)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 74,269 bytes −14 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 74,283 bytes −45 Set a claim value: summary (P836): O projeto consiste em duas instalações fotovoltaicas (com uma capacidade de 40 kW e 30 kW) para a estação de tratamento de águas residuais e a estação de tratamento de águas em Ornet. O projeto produzirá os seguintes elementos necessários para o bom funcionamento da central fotovoltaica: módulos fotovoltaicos (painéis), inversores, construção, segurança CC, segurança CA, instalação de raios, materiais de montagem, instalação, monitorização (sistema...

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 16:4316:43, 2 March 2023DG Regio talk contribs 71,570 bytes +913 Changed label, description and/or aliases in lv, da, sk, ro, pt, cs, de, et, sv, lt, bg, ga, sl, hu, es, hr, mt, fr, nl, el, fi, it, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 17:3817:38, 27 July 2022DG Regio talk contribs 68,974 bytes +42,980 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 16,390 bytes +2,374 Created claim: summary (P836): Le projet consiste en la construction de deux installations photovoltaïques (40 kW et 30 kW) pour les stations d’épuration des eaux usées et les stations d’épuration des eaux usées à Ornet. Le projet mettra en œuvre les éléments suivants nécessaires au bon fonctionnement de la centrale photovoltaïque: modules photovoltaïques (panneaux), onduleurs, construction, protection CC, sécurité AC, système de protection contre la foudre, matériaux de mont...
  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 14,016 bytes +144 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 14,311 bytes +117 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 14,194 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 14,322 bytes +2,163 Created claim: summary (P836): The project consists of two photovoltaic installations (with a capacity of 40 kW and 30 kW) for the sewage treatment plant and water treatment plant in Ornet. The project will produce the following elements necessary for the proper functioning of the photovoltaic power plant: photovoltaic modules (panels), Inverters, construction, DC security, AC security, lightning installation, assembly materials, installation, monitoring (IT system) and fixed...
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 12,159 bytes −1,737 Removed claim: summary (P836): The project consists of the execution of two photovoltaic installations (with a power of 40 kW and 30 kW) for wastewater treatment plants and water treatment plants in Orneo. The project will provide the following elements for the proper functioning of the photovoltaic power plant: solar modules (panels), inverters, construction, DC protection, AC guards, lightning protection, installation materials, mounting, monitoring (IT system) and wiring...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3420:34, 10 March 2020DG Regio talk contribs 12,174 bytes +1,737 Created claim: summary (P836): The project consists of the execution of two photovoltaic installations (with a power of 40 kW and 30 kW) for wastewater treatment plants and water treatment plants in Orneo. The project will provide the following elements for the proper functioning of the photovoltaic power plant: solar modules (panels), inverters, construction, DC protection, AC guards, lightning protection, installation materials, mounting, monitoring (IT system) and wiring a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020