Revision history of "The use of renewable energy sources by the company Rose Winds by installing photovoltaic panels and heat pumps." (Q131768)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 90,239 bytes +6 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 90,233 bytes −87 Set a claim value: summary (P836): Este projeto consiste na aquisição e instalação de uma central fotovoltaica de telhado e solo de 0,04284 MW e de uma bomba de calor ar-água com uma capacidade de 0,04550 MW em Węgorzewo on ul. Abastecimento de água 1 na parcela 90/9 Kal. O projeto enquadra-se no tipo de projeto mencionado no SzOOP RPO WiM 2014-2020 para a ação 4.1 – instalações de energia solar – até 2 MWe/MWth. A instalação de acordo com a possibilidade descrita no SzOOP servirá as...

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 87,562 bytes +1,414 Changed label, description and/or aliases in lv, it, da, sk, fi, pt, ro, hu, et, fr, el, ga, sl, sv, lt, hr, mt, nl, de, bg, cs, es, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4522:45, 2 July 2022DG Regio talk contribs 84,473 bytes +54,058 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 18,248 bytes +3,012 Created claim: summary (P836): Ce projet consiste en l’achat et l’installation d’un toit et d’une centrale photovoltaïque au sol d’une capacité de 0,04284 MW et d’une pompe à chaleur air-eau d’une capacité de 0,04550 MW dans la localité de Węgorzewo, ul. Approvisionnement en eau 1 sur la parcelle 90/9 de Kal. Le projet s’inscrit dans le type de projet indiqué dans le SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations d’énergie solaire — jusqu’à 2 MWe/MWth. L’installat...
  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 15,236 bytes +205 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,470 bytes +171 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,299 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,459 bytes +2,672 Created claim: summary (P836): This project consists of the purchase and installation of a 0.04284 MW roof and ground photovoltaic power plant and an air-water heat pump with a capacity of 0.04550 MW in Węgorzewo on ul. Water supply 1 on plot 90/9 Kal. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations – up to 2 MWe/MWth. The installation according to the possibility described in the SzOOP will serve...
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 12,787 bytes −2,125 Removed claim: summary (P836): This project consists of the purchase and installation of roof and land photovoltaic plants of 0.04284 MW and air-to-water heat pump with an output of 0.04550 MW in Węgorzewo at ul. 1 on parcel 90/9. The project is part of the project type referred to in SzOOP ROP WiM 2014-2020 for activity 4.1 — solar installations — up to 2 MWe/MWth. The installation as described in the SzooP will serve the needs of its own business and be connected to the g...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3420:34, 10 March 2020DG Regio talk contribs 13,186 bytes +2,125 Created claim: summary (P836): This project consists of the purchase and installation of roof and land photovoltaic plants of 0.04284 MW and air-to-water heat pump with an output of 0.04550 MW in Węgorzewo at ul. 1 on parcel 90/9. The project is part of the project type referred to in SzOOP ROP WiM 2014-2020 for activity 4.1 — solar installations — up to 2 MWe/MWth. The installation as described in the SzooP will serve the needs of its own business and be connected to the gri...

25 February 2020

18 February 2020

31 January 2020

14 January 2020