Revision history of "The use of renewable energy sources through the installation of photovoltaic panels and heat pump cascades by Dariusz Bagiński." (Q131767)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 90,369 bytes +6,606 Changed label, description and/or aliases in sk, da, it, el, sv, bg, lv, hu, ro, fi, de, ga, et, cs, pt, lt, nl, sl, es, mt, hr, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 17:3817:38, 27 July 2022DG Regio talk contribs 82,085 bytes +51,102 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 18,326 bytes +3,138 Created claim: summary (P836): Ce projet consiste en l’achat et l’installation d’une centrale photovoltaïque sur le toit d’une capacité de 0,04992 MW et de 14 heures de chaleur air-eau d’une capacité totale de 0,136 MW dans la ville d’Olecko à ul. Gołdapska 12 sur dz.48 zone 2.Le projet s’inscrit dans le type de projet indiqué dans SzOOP ROP WiM 2014-2020 pour l’action 4.1-installations utilisant l’énergie solaire — jusqu’à 2 MWe/MWth. L’installation selon la possibilité décr...
  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 15,188 bytes +222 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,405 bytes +188 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,217 bytes −175 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,392 bytes +2,533 Created claim: summary (P836): This project consists of the purchase and installation of a roof photovoltaic power plant with a capacity of 0.04992 MW and 2 pump of air-water heat with a total capacity of 0.136 MW in Olecko on ul. Gołdapska 12 per dz.48 perimeter 2.The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for the operation of 4.1-installations using solar energy – up to 2 MWe/MWth. The installation according to the possibility describ...
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 12,859 bytes −2,301 Removed claim: summary (P836): This project consists of the purchase and installation of a roof photovoltaic power plant of 0.04992 MW and 2- air-to-water heat pumps with a total capacity of 0.136 MW in Oleko at ul. Gołdapska 12 in j.48 and 2.This project is part of the project type referred to in SzOOP ROP WiM 2014-2020 for 4.1-2 MWe of the solar installations. The installation as described in the SzooP will serve the needs of its own business and be connected to the grid,...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3420:34, 10 March 2020DG Regio talk contribs 13,434 bytes +2,301 Created claim: summary (P836): This project consists of the purchase and installation of a roof photovoltaic power plant of 0.04992 MW and 2- air-to-water heat pumps with a total capacity of 0.136 MW in Oleko at ul. Gołdapska 12 in j.48 and 2.This project is part of the project type referred to in SzOOP ROP WiM 2014-2020 for 4.1-2 MWe of the solar installations. The installation as described in the SzooP will serve the needs of its own business and be connected to the grid, b...

25 February 2020

18 February 2020

31 January 2020

14 January 2020