Revision history of "Investments in RES in RUMSZEWICZ SAILING" (Q131765)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1104:11, 11 October 2024DG Regio talk contribs 93,141 bytes −2 Changed label, description and/or aliases in pt
  • curprev 04:1104:11, 11 October 2024DG Regio talk contribs 93,143 bytes −38 Set a claim value: summary (P836): No âmbito do projeto, está prevista a construção de PC e PV; localização: Wilimy, Wilima, parcelas: 200/2, 200/3, 200/4 200/5 livro perpétuo Kw No.OL1B/00012995/8, 206/3 e 206/5 livro perpétuo Kw No.OL1B/00013121/8 1.Instalação pv-50 kWp, no telhado – 151 peças de painéis monocristalinos com uma capacidade de 330 W cada e uma potência total de instalação de 49,83 kWp. Conjunto de 2 inversores trifásicos com potência nominal de 20 kW e 1 com potência...

7 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4522:45, 2 July 2022DG Regio talk contribs 87,816 bytes +56,650 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 18,444 bytes +3,123 Created claim: summary (P836): Dans le cadre du projet, la construction de PC et de PV est prévue; lieu: Wilima, Wilima, parcelles de terrain: 200/2, 200/3, 200/4 200/5 cadastre Kw No OL1B/00012995/8, 206/3 et 206/5 cadastre Kw No OL1B/00013121/8 Installation 1.Pv-50 kWp, sur le toit — 151 pièces de panneaux monocristallins d’une puissance de 330 W chacun et la puissance totale de l’installation 49,83 kWp. L’installation de 2 onduleurs triphasés d’une puissance nominale de 20...
  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 15,321 bytes +126 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,634 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,535 bytes −93 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 15,628 bytes +2,978 Created claim: summary (P836): As part of the project, the construction of PC and PV is planned; location: Wilimy, Wilima, plots: 200/2, 200/3, 200/4 200/5 perpetual book Kw No.OL1B/00012995/8, 206/3 and 206/5 perpetual book Kw No.OL1B/00013121/8 1.Installation pv-50 kWp, on the roof – 151 pieces of monocrystalline panels with a capacity 330 W each and total installation power 49.83 kWp. The assembly of 2 three-phase inverters with rated power of 20 kW and 1 with a power of 4...
  • curprev 15:5915:59, 21 October 2020DG Regio talk contribs 12,650 bytes −2,521 Removed claim: summary (P836): The project is planned to build a PC and PV; location: Wilima, Welima, the plots of land: 200/2, 200/3, 200/4 200/5 land ledger No OL1B/00012995/8, 206/3 and 206/5 land ledger No OL1B/00013121/8, and 1.Installation PV-50 kWp, on the roof — 151 mono-crystalline 330W installations each and a total capacity of 49,83 kWp. One of the 2 three-phase inverters with a rated output of 20 kW and 1 with a power of 4.5 kW 2.Installation of heat pumps is pl...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3420:34, 10 March 2020DG Regio talk contribs 13,447 bytes +2,521 Created claim: summary (P836): The project is planned to build a PC and PV; location: Wilima, Welima, the plots of land: 200/2, 200/3, 200/4 200/5 land ledger No OL1B/00012995/8, 206/3 and 206/5 land ledger No OL1B/00013121/8, and 1.Installation PV-50 kWp, on the roof — 151 mono-crystalline 330W installations each and a total capacity of 49,83 kWp. One of the 2 three-phase inverters with a rated output of 20 kW and 1 with a power of 4.5 kW 2.Installation of heat pumps is plan...

25 February 2020

18 February 2020

31 January 2020

14 January 2020