Revision history of "Application of RES installations for the company Stawiska Recreation" (Q131756)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1004:10, 11 October 2024DG Regio talk contribs 86,771 bytes +1 Changed label, description and/or aliases in pt
  • curprev 04:1004:10, 11 October 2024DG Regio talk contribs 86,770 bytes −23 Set a claim value: summary (P836): No âmbito do projeto, estão previstas duas instalações FER: instalação fotovoltaica na rede com uma potência de aprox.29,15kWp e instalação com uma bomba de calor vertical com uma potência de aprox. 108kW. As instalações serão utilizadas para a produção de eletricidade e calor a utilizar nas atividades do requerente: «Recreation Stawiska S.c.». O investimento situar-se-á em Elbląg, na ul. Kosciuszko 134a, parcela n.o 194/2, perímetro 9. ÂMBITO DE AP...

20 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 84,035 bytes −612 Changed label, description and/or aliases in da, it, sk, sv, fi, el, et, cs, fr, bg, ga, pt, lv, de, lt, ro, es, hr, hu, nl, sl, mt, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4522:45, 2 July 2022DG Regio talk contribs 82,990 bytes +53,152 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 17,896 bytes +3,015 Created claim: summary (P836): Le projet prévoit la construction de deux installations SER: installation photovoltaïque sur réseau d’une puissance d’environ 29,15 kWp et installation à l’aide d’une pompe à chaleur verticale d’une puissance d’environ 108 kW. Les installations seront utilisées pour la production d’électricité et de chaleur à utiliser pour les activités du demandeur: Stawiska RECREATION s.c. L’investissement sera situé à Elbląg à ul. Kościuszki 134a, parcelle no...
  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 14,881 bytes +130 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,190 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,063 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,184 bytes +2,625 Created claim: summary (P836): As part of the project, two RES installations are planned: photovoltaic installation on grid with a power of approx.29,15kWp and installation using a vertical heat pump with a power of approx.108kW. Installations will be used for the production of electricity and heat to be used for the applicant’s activities: “Recreation Stawiska S.c.”. The investment will be located in Elbląg on ul. Kosciuszko 134a, plot no. 194/2, perimeter 9. SCOPE AND STAGE...
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 12,559 bytes −2,162 Removed claim: summary (P836): Under the project, two RES installations are planned: a 29,15kWp and a vertical heat pump installation with a power ox108kW power grid installation. Installations will be used for the production of electricity and heat to be used for the purposes of the applicant’s activities: Ms Stawiaka Realizacji s.c. The investment will be located in Elbląg, ul. Kościuszki 134a on plot No 194/2, area 9. SCOPE AND PHASES OF THE INVESTMENT: 1. Preparatory wo...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3420:34, 10 March 2020DG Regio talk contribs 13,006 bytes +2,162 Created claim: summary (P836): Under the project, two RES installations are planned: a 29,15kWp and a vertical heat pump installation with a power ox108kW power grid installation. Installations will be used for the production of electricity and heat to be used for the purposes of the applicant’s activities: Ms Stawiaka Realizacji s.c. The investment will be located in Elbląg, ul. Kościuszki 134a on plot No 194/2, area 9. SCOPE AND PHASES OF THE INVESTMENT: 1. Preparatory work...

25 February 2020

18 February 2020

31 January 2020

14 January 2020