Revision history of "Purchase and assembly of 40 kW photovoltaic installation at PPHU LIMBA RYSZARD MAJEWSKI AND TOMASZ Szerel JAWNA" (Q131752)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 85,966 bytes +1,411 Changed label, description and/or aliases in lv, it, da, sk, ro, fr, fi, sv, hr, et, ga, sl, lt, de, hu, pt, nl, bg, es, mt, cs, el, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4522:45, 2 July 2022DG Regio talk contribs 82,884 bytes +52,793 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 18,124 bytes +2,977 Created claim: summary (P836): L’investissement prévu consistera en l’achat et l’installation d’une installation photovoltaïque située sur le terrain no 137/3 à Kukowo, sur le toit du bâtiment de production. La puissance de l’installation sera de 39,90 kW. Aucun permis de construire ou décision environnementale n’est requis pour la mise en œuvre de l’investissement. L’énergie obtenue sera utilisée pour les besoins propres de l’entreprise et l’excédent d’énergie sera vendu à l...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 15,147 bytes +193 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,393 bytes +171 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,222 bytes −203 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,425 bytes +2,705 Created claim: summary (P836): The planned investment will consist of the purchase and installation of a photovoltaic installation located on plot No 137/3 in Kukowo on the roof of the production building. The installation power will be 39.90 kW. No construction permit or environmental decision are required to carry out this investment. The resulting energy will be used for the own needs of the company and the excess energy will be sold to a nationwide electricity operator. T...
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 12,720 bytes −2,315 Removed claim: summary (P836): The planned investment will consist of the purchase and installation of a photovoltaic installation located on plot No 137/3 in Kukowo on the roof of the building. The capacity of the installation will be 39.90 kW. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulting energy will be used for the company’s own needs and surplus energy will be sold to th...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3320:33, 10 March 2020DG Regio talk contribs 13,309 bytes +2,315 Created claim: summary (P836): The planned investment will consist of the purchase and installation of a photovoltaic installation located on plot No 137/3 in Kukowo on the roof of the building. The capacity of the installation will be 39.90 kW. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulting energy will be used for the company’s own needs and surplus energy will be sold to the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020