Revision history of "Purchase and assembly of 40 kW photovoltaic installation in the company “Drew-Gór Dorz” Sp. z o.o." (Q131751)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 91,629 bytes −18 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 91,647 bytes −143 Set a claim value: summary (P836): O investimento previsto consistirá na aquisição e montagem de 1 instalações fotovoltaicas no edifício da empresa DREW GÓR sp. z o.o., com o terreno n.o 55/5. gm. Iława, cidade de Karaś, utilizando painéis fotovoltaicos. A potência total da instalação será de 39,96 kW. Não é necessária qualquer licença de construção ou decisão ambiental para realizar este investimento. A energia resultante será utilizada para as próprias necessidades da empresa e o e...

20 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 89,393 bytes +1,851 Changed label, description and/or aliases in lv, it, da, sk, el, et, fr, lt, fi, nl, ro, pt, cs, bg, ga, hr, sv, sl, es, de, hu, mt, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4522:45, 2 July 2022DG Regio talk contribs 85,422 bytes +55,293 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 17,575 bytes +3,142 Created claim: summary (P836): L’investissement prévu consistera en l’achat et l’installation d’une installation photovoltaïque sur le bâtiment DREW Gór sp. z o.o. a la parcelle no 55/5. Iława, ville de Karaś à l’aide de panneaux photovoltaïques. La puissance totale de l’installation sera de 39,96 kW. Aucun permis de construire ou décision environnementale n’est requis pour la mise en œuvre de l’investissement. L’énergie obtenue sera utilisée pour les besoins propres de l’ent...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 14,433 bytes +164 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 14,708 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 14,545 bytes −165 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 14,710 bytes +2,813 Created claim: summary (P836): The planned investment will consist of the purchase and assembly of 1 photovoltaic installations on the building of the company DREW GÓR sp. z o.o. has plot no. 55/5. gm. Iława, town of Karaś using photovoltaic panels. The total power of the installation will be 39.96 kW. No construction permit or environmental decision are required to carry out this investment. The resulting energy will be used for the own needs of the company and the excess en...
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 11,897 bytes −2,468 Removed claim: summary (P836): The planned investment will consist of the purchase and the installation of 1 photovoltaic installations at the DREAW mountain sp. z o.o. building, which has plot No 55/5. gm. Iława, the town of Karaś using solar panels. The total power of the installation will be 39.96 kW. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulting energy will be used for t...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3320:33, 10 March 2020DG Regio talk contribs 13,092 bytes +2,468 Created claim: summary (P836): The planned investment will consist of the purchase and the installation of 1 photovoltaic installations at the DREAW mountain sp. z o.o. building, which has plot No 55/5. gm. Iława, the town of Karaś using solar panels. The total power of the installation will be 39.96 kW. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulting energy will be used for the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020