Revision history of "Investments in RES in the company Transport services Artur Kotarski" (Q131727)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2306:23, 9 October 2024DG Regio talk contribs 89,410 bytes −361 Set a claim value: summary (P836): O pedido prevê a construção de uma central fotovoltaica de 24,64 kWp localizada no telhado do edifício Dz. n.o 156/17 Polska Wieś. A instalação projetada é composta por 88 módulos com uma capacidade de 280 W.Os módulos equipados com dispositivos de otimização de energia são projetados.O objetivo da instalação fotovoltaica é gerar eletricidade com os parâmetros da rede elétrica e, em seguida, desenvolvê-la na instalação elétrica interna pelo cliente....

12 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4422:44, 2 July 2022DG Regio talk contribs 80,539 bytes +49,931 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 18,049 bytes +3,060 Created claim: summary (P836): La présente demande prévoit la construction d’une centrale photovoltaïque de 24,64 kWp située sur le toit du bâtiment no 156/17 Polska Wieś. L’installation conçue est construite à partir de 88 modules d’une puissance de 280 W. Les modules sont conçus avec des optimisations de puissance. La tâche de la projection de l’installation photovoltaïque est de produire de l’électricité avec les paramètres du réseau électrique, puis de le développer dans...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 14,989 bytes +144 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,284 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,158 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,276 bytes +2,567 Created claim: summary (P836): The application foresees the construction of a 24.64kWp photovoltaic power plant located on the roof of the building Dz.No. 156/17 Polska Wieś. The designed installation consists of 88 modules with a capacity of 280 W.The modules equipped with power optimisation devices are designed.The aim of the photovoltaic installation is to generate electricity with the parameters of the power grid, and then to develop it in the internal electrical installa...
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 12,709 bytes −2,094 Removed claim: summary (P836): The application provides for the construction of a 24,64kWp photovoltaic power plant located on the roof of the B building. The planned installation is constructed with 88 modules of 280 designs. the design is designed for modules equipped to optimise the mocy.Activity. the installation of a photovoltaic installation is the generation of electricity with the parameters of the electricity grid and then its installation in the internal electrica...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3320:33, 10 March 2020DG Regio talk contribs 13,078 bytes +2,094 Created claim: summary (P836): The application provides for the construction of a 24,64kWp photovoltaic power plant located on the roof of the B building. The planned installation is constructed with 88 modules of 280 designs. the design is designed for modules equipped to optimise the mocy.Activity. the installation of a photovoltaic installation is the generation of electricity with the parameters of the electricity grid and then its installation in the internal electrical...

25 February 2020

18 February 2020

31 January 2020

14 January 2020